background image

      A l e r t   -   2   S e r i e s  

P a g e :   5  

DESCRIPTION OF THE MANIFOLD

SHIPMENT DETAILS

The package consists of one fully tested Alert-2 Series Manifold.  Optional back support bracket, 

header bar assemblies, and pigtails are available. 

THE COLLAPSABLE BACK BRACKET

The collapsible back bracket is designed to be shipped with the manifold, without taking up space. 

The bracket will position the manifold cabinet 12” from the wall, for double cylinder spacing. 

DESCRIPTION OF PARTS

The ALERT-2  economy manifold  is divided into (2) main sections: 

COMMON TO ALL ECONOMY MANIFOLDS

1.

PRESSURE REGULATORS

There are two types of regulators in the Amico manifold: the operating pressure regulator and 

the line pressure regulator. Both types conform to NFPA 99. . 

1. Operating (Source) Regulators

There are two operating regulators on every manifold, one for the left bank and one for the right 

bank.  For Oxygen, Nitrous Oxide, compressed Medical Air and Carbon Dioxide service, the “In 

Use” regulator will be set at  200 psi and the “Reserve” regulator will be set at 120 psi . For 

Nitrogen the “In Use” regulator will be set at 250 psi and the “Reserve” regulator will be set at 

200 psi. 

2. Line Regulators

There are also one or two line regulators on every manifold. The line regulator is capable of 

maintaining a constant dynamic delivery pressure at the maximum design flow rate of the 

system (factory preset to “0”). For Oxygen, Nitrous Oxide, compressed Medical Air and Carbon 

Dioxide service, the line regulator(s) should be set at 55 psig [379 kPa]. For Nitrogen service, 

the regulator(s) are to be set at 170 psig [1172 kPa]. 

2.

PRESSURE RELIEF VALVES

Pressure relief valves are installed downstream of all pressure regulators and are set at no 

more than 50% above the setting of the pressure regulator located immediately upstream. All 

pressure relief valves are capable of fully relieving the pressure at the set point and are upstream 

of any shut-off valve. 

All pressure relief valves in the manifold have piping connections to allow for connection of vent 

Содержание ALERT- 2

Страница 1: ...ECONOMY MANIFOLD ALERT 2 Installation and Maintenance Manual v1 5...

Страница 2: ...G ALARM SYSTEMS 7 SAFETY FEATURES 7 INSTALLATION8 RECEIPT AND LOCATION 7 ASSEMBLY INSTRUCTIONS 7 TESTING FOR LEAKAGE 9 FINAL TESTING 10 NORMAL OPERATING PROCEDURE 10 MAINTENANCE 11 GENERAL 11 CYLINDER...

Страница 3: ...are broken missing worn distorted or contaminated must be replaced immediately Should such repair or replacement become neces sary please contact Amico Corporation or their distributors All manifolds...

Страница 4: ...he master alarm or remote buzzer informing the hospital personnel that the In Use cylinder bank pressure is low and the cylinders need replacement At this point someone has to silence the alarm or buz...

Страница 5: ...mpressed Medical Air and Carbon Dioxide service the In Use regulator will be set at 200 psi and the Reserve regulator will be set at 120 psi For Nitrogen the In Use regulator will be set at 250 psi an...

Страница 6: ...tem Without Reserve Supply as classified in NFPA 99 Clause 4 3 1 5 This is one category of the broader classification Central Supply System which encompasses many types of sources of supply to nonflam...

Страница 7: ...cabinet door The two pipes extending from the top of the manifold one for line pressure relief and one for the operating pressure relief are labelled Cylinder Connections The Amico manifold is design...

Страница 8: ...boltssuppliedaspartoftheassemblies Removetheplugandchainassemblyoneachoutletconnectiononthecylinderextensionbar Attach the cylinder pigtails to the header bar connections while ensuring the check val...

Страница 9: ...nder extensionbarusingthecopperorstainlesssteelcylinderconnectionhoseassemblies pigtails supplied 2 Make sure all other outlets are capped with the plug and chain assemblies supplied 3 Make sure that...

Страница 10: ...ng at least one full minute allow time for the dissipation of generated heat S L O W L Y open all the rest of the cylinder valves one at a time The bank that was pressurized first will become the prim...

Страница 11: ...nd Valves A Inspect semiannually and test for external leakage and tightness of shut off CYLINDER EXTENSION BARS The following components shall be inspected semiannually as indicated 1 Test check valv...

Страница 12: ...ssure Regulator Faults Gas leakage around oper ating pressure regulator bodycap Venting at intermediate relief valve Pipeline not at desired pressure Required gas flow not available Low pressure relie...

Страница 13: ...OPEN THE CYLINDER VALVE ON THE CYLINDER CLOSEST TO THE CONTROL CABINET WATCH THE BANK PRESSURE DISPLAY ON THE FRONT OF THE CABINET TO MAKE SURE THE PRESSURE RISES SLOWLY TO THE FULL CYLINDER PRESSURE...

Страница 14: ...rogen NIT Header bars are sold separately M2 HBSG 04U GAS HBSG Staggard header bar or HBST Straight header bar 04 represents the number of cylinders 2 2 U represents language and color code U NFPA USA...

Страница 15: ...ug Chain assembly Nit M X HB NUT NIT Plug Chain assembly Oxy M X MAN 36 Copper pigtail c w Check valve M X HB PTC AIR Air Copper pigtail c w Check valve M X HB PTC CO2 CO2 Copper pigtail c w Check val...

Страница 16: ...E c o n o m y M a n i f o l d P a g e 1 6 APPENDIX A Economy Manifold Layout...

Страница 17: ...A l e r t 2 S e r i e s P a g e 1 7 APPENDIX B Piping Schematic Diagram NFPA...

Страница 18: ...Not supplied by Amico Hole size to be determined by the customer Recommended distance 57 from floor to center of bottom hole 14 50 15 00 14 50 381 mm Recommended distance 57 1448 mm from floor to cent...

Страница 19: ...14MadisonRd Fairfield NJ07004USA Tel 1 877 GOAMICO 1 877 462 6426 85FultonWay RichmondHill ONL4B2N4Canada Fax 905 764 0862www amico com AUG 04 M2 MANUAL ECO...

Отзывы: