![amiad AMF-370K-S Скачать руководство пользователя страница 57](http://html.mh-extra.com/html/amiad/amf-370k-s/amf-370k-s_installation-and-operation-instructions-manual_2932256057.webp)
AMF 370K -S
02.2018
Page 57 of 86
4. Start-up and First Operation
In order to achieve maximum performance and smooth operation of the filter it is crucial to perform the Startup and First
Operation procedures exactly as described in this section. Please read carefully the following instructions prior to any
attempt to operate the filter.
Commissioning the filter should be done by an authorized Amiad technician, do not attempt to commission
the filter unaccompanied.
Please contact your supplier for coordinating a technician visit.
Failing to coordinate the start-up process with your supplier may lead to undesired damage and may affect
your warranty coverage.
The start-up procedure is a multistage process; the following checklists describe step by step the actions to be done in
order to successfully commission the filter:
4.1. Dry stage – connections verification
Important notes:
Before starting the dry stage of the filter start-up it is very important to make sure that the filter is empty and isolated
from the water system by verifying visually that:
The upstream and the downstream manual isolation valves are closed
The flushing water supply line isolation valve is manually closed
Consult your Certified Installation Arrangement Drawings for these manual valves details.
The following checklist lists the actions to be done during the dry stage.
√
Num.
Action
Picture
4.1.1
Main piston positioning:
In order to ensure that the main piston’s spry nozzles are
not within the cassette package limits, it is necessary to
verify that the main piston is at SW1 switch position.
1.
Remove the plug from the 3” flange of the tail
assembly.
2.
Insert a clean and straight 4.5 meter 0.5” pipe or
rod through the opened connection.
3.
Using the rod push the piston all the way in and
then remove the rod out of the filter.
1
1
Содержание AMF-370K-S
Страница 30: ...AMF 370K S 02 2018 Page 30 of 86 ...
Страница 36: ...AMF 370K S 02 2018 Page 36 of 86 Press this To get this Press this To get this Press this To get this ...
Страница 64: ...AMF 370K S 02 2018 Page 64 of 86 3 4 5 ...
Страница 68: ...AMF 370K S 02 2018 Page 68 of 86 5 2 Control cabinet drawings ...
Страница 69: ...AMF 370K S 02 2018 Page 69 of 86 ...
Страница 70: ...AMF 370K S 02 2018 Page 70 of 86 ...
Страница 71: ...AMF 370K S 02 2018 Page 71 of 86 ...
Страница 72: ...AMF 370K S 02 2018 Page 72 of 86 ...
Страница 73: ...AMF 370K S 02 2018 Page 73 of 86 ...
Страница 74: ...AMF 370K S 02 2018 Page 74 of 86 ...
Страница 75: ...AMF 370K S 02 2018 Page 75 of 86 ...
Страница 76: ...AMF 370K S 02 2018 Page 76 of 86 ...
Страница 77: ...AMF 370K S 02 2018 Page 77 of 86 ...
Страница 78: ...AMF 370K S 02 2018 Page 78 of 86 ...
Страница 79: ...AMF 370K S 02 2018 Page 79 of 86 ...
Страница 80: ...AMF 370K S 02 2018 Page 80 of 86 ...
Страница 81: ...AMF 370K S 02 2018 Page 81 of 86 ...
Страница 82: ...AMF 370K S 02 2018 Page 82 of 86 ...