AMF² 36K + HMI 08.2013
Page 60 of 71
Actions to be done during the step by step operation:
Start the step by step process as described in the general
section of this paragraph and run through the process
from start to end.
1.
Monitor the progress of each step closely and
verify that it starts and stops correctly.
2.
Make sure that the discharge pressure of the
flushing pump is 10 bars. If the pressure does
not meet this level do not continue the step by
step process and check the pump for
malfunctions such as: wrong rotation direction,
insufficient air bleeding, insufficient water
supply, Opened bypass valve, etc.
Note: the pump’s bypass valve must remain
closed at all times
(A)
, you may open it slightly
only if the pressure during flushing is higher
than 10 bars.
Check the pressure at pressure meter (B) on the
very beginning of the flushing process before
the piston movement starts. If the pressure is
higher than 10 bar use the bypass to calibrate
it. Make sure that the bypass valve remains
closed If the pressure is 10 bar or less.
3.
During the Cartridges’ Cleaning steps use the 2
adjustment ball valves located at the controlled
manifold to set the main piston movement
speed to 9-10 seconds in each direction.
If any malfunction is encountered during the step by step
process stop the operation and contact your supplier!
(A)
(B)
3
Содержание AMF-36K
Страница 16: ...Figure 25 ...
Страница 17: ...AMF 36K HMI 08 2013 Page 17 of 71 ...
Страница 23: ...AMF 36K HMI 08 2013 Page 23 of 71 1 3 ...
Страница 36: ...AMF 36K HMI 08 2013 Page 36 of 71 Press this To get this Press this To get this Press this To get this ...
Страница 65: ...AMF 36K HMI 08 2013 Page 65 of 71 5 3 Control cabinet drawings ...
Страница 66: ...AMF 36K HMI 08 2013 Page 66 of 71 ...
Страница 67: ...AMF 36K HMI 08 2013 Page 67 of 71 ...
Страница 68: ...AMF 36K HMI 08 2013 Page 68 of 71 ...
Страница 69: ...AMF 36K HMI 08 2013 Page 69 of 71 ...
Страница 70: ...AMF 36K HMI 08 2013 Page 70 of 71 ...