20
VII.MAINTENANCE SCHEDULE
Monthly:
1.
Re-torque the anchor bolts to 150 Nm;
2.
Check all connectors, bolts and pins to insure proper mounting;
3.
Lubricate cable with lubricant;
4.
Make a visual inspection of all hydraulic hoses/lines for possible wear or leakage;
5.
Check Safety device and make sure proper condition;
6.
Lubricate all Rollers and Pins with 90wt. Gear oil or equivalent;
Note: All anchor bolts should take full torque. If any of the bolts does not function
for any reason, DO NOT use the lift until the bolt has been replaced.
Every six months:
1.
Make a visual inspection of all moving parts for possible wear, interference or damage.
2.
Check and adjust as necessary, equalizer tension of the cables to insure level lifting.
3.
Check the vertical of columns.
4.
Check Rubber Pads and replace as necessary.
5.
Check Safety device and make sure proper condition.
Содержание SML-6
Страница 1: ...SINGLE POST LIFT Model SML 6...
Страница 4: ...2 Arm Swings View Fig 2...
Страница 17: ...15 EXPLOEDED VIEW Model SML 6 Fig 24...
Страница 18: ...16 Manual Power Unit Fig 26 11V 60HZ 1 phase Cylinder exploded view Fig 25...