6
C. Lay the base flat to the ground, confirm installation place according to the
ground state, the main purpose is to save space. (See Fig.8)
D. Install column and lift platform
1.Lay the column flat to the ground.(See Fig.9)
2.Connecting oil hose of cylinder. (See Fig.10)
Fig.8
Fig.10
Pull open the carriage
about 200mm
Fig.9
2
1
Connecting oil hose
to the fitting of
cylinder
Fig.9
Содержание SML-6
Страница 1: ...SINGLE POST LIFT Model SML 6...
Страница 4: ...2 Arm Swings View Fig 2...
Страница 17: ...15 EXPLOEDED VIEW Model SML 6 Fig 24...
Страница 18: ...16 Manual Power Unit Fig 26 11V 60HZ 1 phase Cylinder exploded view Fig 25...