C. PEAK electric power unit, 380V/50HZ, 3 phase (See Fig. 45)
V. TEST RUN
1. Adjust synchronous cable
(See Fig. 46)
Press
UP
button to lift the carriage up to the position
of the cable nut higher than chain pulley. Use wrench
to hold the cable fitting, meanwhile use
ratchet
spanner to tighten the cable nut. Make sure two
cables are in the same tension so that two lifting
carriages can work synchronously.
Fit the plastic hole
cover
on the lifting head.
If the carriage does not Synchronize when lifting,
please tighten the cable nut of lower side carriage.
2. Adjust safety cable
Lifting the carriage and lock at the same height, strain the safety cable and then
release a little, and then tighten the cable nuts. Make sure the safety device can
always be worked properly.
Fig. 46
Cable Nut
Содержание A240
Страница 1: ...TWO POST LIFT Model A240 ...
Страница 4: ...2 Arm Swings View 2513mm 1270mm 814mm 683mm 1159mm Fig 2 ...
Страница 11: ...9 2 Install cables See Fig 14 Fig 14 ...
Страница 12: ...10 F Assembly oil hose assy 1 Install oil hose See Fig 15 Fig 15 81 85 81A 81 79A 80 81 81 79 ...
Страница 26: ...24 IV EXPLODED VIEW Model A240 Fig 38 Car in direction ...
Страница 27: ...25 Cylinders Control Box Fig 39 Fig 40 ...
Страница 40: ... 38 72225302 01 2014 ...