8
E. Connecting the cables
1
.
Connect the cables under step
a
to
f
(See Fig. 13).
d.
Cable pass through
the small pulley in
another column
c.
Pass through the
cable from the
small pulley
a.
Cable passes through
the carriage
e.
Pull the cable from
bottom to top and
pass through the
cable from big pulley
f.
The fitting of cable pass
through the hole of the
carriages and be screwed
with two cable nuts
b.
Push the carriages higher than
chain pulley, cable pass through
the top of the carriages and pass
through the hole of the bottom
steel plate of the carriages
Fig. 13
Содержание A240
Страница 1: ...TWO POST LIFT Model A240 ...
Страница 4: ...2 Arm Swings View 2513mm 1270mm 814mm 683mm 1159mm Fig 2 ...
Страница 11: ...9 2 Install cables See Fig 14 Fig 14 ...
Страница 12: ...10 F Assembly oil hose assy 1 Install oil hose See Fig 15 Fig 15 81 85 81A 81 79A 80 81 81 79 ...
Страница 26: ...24 IV EXPLODED VIEW Model A240 Fig 38 Car in direction ...
Страница 27: ...25 Cylinders Control Box Fig 39 Fig 40 ...
Страница 40: ... 38 72225302 01 2014 ...