- 12 -
H. Install power-side platform.
1. Put the power-side platform upon the cross beams by forklift or manual, offset the cross
beams to the outside till the pulleys of both platforms can set up into the cross beam
(See
Fig.21,22)
, Install the power-side platform and screw up the bolts
(See Fig.23)
.
Beams and columns tilt
outward
Beams and columns tilt
outward
Power-side platform
Tighten the platform and beam with M16 *
40 hex screws
Fig.23
Pulley installation
A view
Fig.21
Pulley installation
B view
Fig.22
A
B
Содержание PRO-12
Страница 1: ...Four Post Lift Model PRO 12 PRO 12A PRO 12AX Original...
Страница 10: ...9 D Install cross beams See Fig 14 Fig 15 Fig 14 Fig 15 2 Hole towards inside 1 3 3...
Страница 24: ...23 IV EXPLODED VIEW Model PRO 12 1 2 3 8 18 44 203 32 49 12 50 51 52 53 45 Fig 46 4...
Страница 31: ...30 3 Power unit 071102 exploded view 220V 60HZ Single Phase Fig 50...