- 15 -
2. The cable pass through the cross beam to top plate of columns and be screwed with cable
nuts
(See Fig. 27, 28),
then install the cable limit pin.
(See Fig. 29)
7
Cable pass through
between the big pulley
and tension pulley
D View
Fig.27
Cable pass through top
plate and be screwed
with cable nuts.
E View
Fig.28
F View
Fig. 29
Install limit pin
Cable
60B
Pulley
60A
Cable Limit pin
E
D
F
After installation
Содержание PRO-12
Страница 1: ...Four Post Lift Model PRO 12 PRO 12A PRO 12AX Original...
Страница 10: ...9 D Install cross beams See Fig 14 Fig 15 Fig 14 Fig 15 2 Hole towards inside 1 3 3...
Страница 24: ...23 IV EXPLODED VIEW Model PRO 12 1 2 3 8 18 44 203 32 49 12 50 51 52 53 45 Fig 46 4...
Страница 31: ...30 3 Power unit 071102 exploded view 220V 60HZ Single Phase Fig 50...