
1-12
S100
Revised 10/2005
e-mail: [email protected] ; [email protected]; website: www.amfreece.com
Phones: +420 582 309 146 (Service), +420 582 309 286 (Spare Parts); Fax: +420 582 360 606
B - MACHINE INSTALLATION
4 . A D J U S T M E N T O F T H E T - B E LT T E N S I O N F O R S E W I N G
The driving belt is placed under the right side cover. After its dismantling, loosen the pulley screw and adjust
the V - belt pulley so that, so that during pushing on the front branch of the belt, there should be a sag about
25 mm (1”), as illustrated. Tighten the screw of the idler pulley.
For easy folding of the machine head, the pulley must be down with tilt min. 30° backwards.
Install the removed cover again.
Idler pulley
Correct belt deflection