background image

 

 

CORRECT

 

TOO LOOSE

 

TOO TIGHT

 

 

Installation Notes and Tips  

(continued)

 

• 

Avoid over

-

driving, under

-

driving, or driving at an angle to properly install fasteners. Over

-

driven 

fasteners can depress the material and allow water to collect around the fastener, which will corrode 
the surface finish. Under

-

driven fasteners can cause leaks and may back out over time.

 

 
 
 

 

• 

The center

-

to

-

center spacing of the roof panel locks must be maintained as the panels are installed.

 

If this is not done, problems may not show up until towards the end of the installation when parts may 
appear to be cut too short or too long. If this happens, check each roof panel spacing and re

-

set if 

necessary.

 

• 

We strongly recommend using a high grade sealant, such as our 100% silicone caulk and sealant. 
Caulking should be applied uniformly and without skips. A poor caulking job can cause leaks.

 

Americana Outdoors, Inc. 

 

3

Screen Room Installation Guide

 

Note: 

These are basic installation guidelines for our standard load units and may not be suitable to your 

specific installation. It is important to follow all local and national building codes when installing any 
exterior improvement product. If you have questions regarding the proper installation of any Americana 
product, please call us toll free at 1

-

888

-

442

-

2928 and ask for assistance. Hours are 8:00am 

-

 5:00pm 

Central Standard Time, Monday 

-

 Friday.

 

 

Refer to the provided manufacturer

s drawing for details and special notes.

 

 

Americana will not be responsible for delays or lost installation time due to failure to follow all 

 Care and Maintenance 

Every 12 months your shade structure should be inspected and maintained by:

 

• 

Tightening loose nuts and bolts at all connections.

 

• 

Repairing damage to the finish to prevent corrosion.

 

• 

Replacing lost or damaged fasteners, brackets, and other parts.

 

• 

Replacing brittle or cracked sealer to prevent leaks.

 

• 

Removing obstructions and miscellaneous build

-

up from gutters, eaves, and downspouts.

 

Содержание SCREEN ROOM

Страница 1: ...r other protective material Prepare surrounding area Remove any obstructions around shelter location Shelter installation should be scheduled after all concrete and masonry work in the surrounding area is completed Assistance is required during entire assembly Proper site preparation is required Standard shade structure design does not include additional loads such as hanging heavy plants swings o...

Страница 2: ...assemble on a day with strong winds Have assistance nearby to lift and secure parts in place As is common in the erection of all types of metal structures due to job site conditions unlevel slabs footings etc slight modifications such as reaming of some holes or drilling new holes may become necessary and must be done on the job site Predrilling holes and removing metal shavings and debris from be...

Страница 3: ...oors Inc 3 Screen Room Installation Guide Note These are basic installation guidelines for our standard load units and may not be suitable to your specific installation It is important to follow all local and national building codes when installing any exterior improvement product If you have questions regarding the proper installation of any Americana product please call us toll free at 1 888 442...

Страница 4: ...Americana Outdoors Inc 4 Screen Room Installation Guide Parts List NOTE Length and quantity of parts will vary based on the size of area ALUMINUM POST BEAM SCREEN WITH RAILING SCREEN DOOR SCREEN ...

Страница 5: ...ications required at each connection point HARDWARE SHOWN ABOVE ACTUAL SIZE Americana Outdoors Inc 5 Screen Room Installation Guide Parts List NOTE Length and quantity of parts will vary based on the size of the shelter HD U BRACKET HD H BRACKET 1x1 ALUMINUM ANGLE 1 2x1 ALUMINUM ANGLE 1 4 x 2 1 4 Round Head Screw 1 4 Acorn Nut 1 4 x 4 Tek Screw 1 4 x 1 1 2 Hex Head Lag Screw 1 4 Bantom Insert Plug...

Страница 6: ...t are for the roof only You may skip this step if you already purchased or have an existing roof Roof options vary on style of pan choice Most common and Americana s top choice is the Yukon Roof Panel Other options will be displayed below YUKON FASCIA TRIM WALL MOUNTING CHANNEL CHANNEL RAIL YUKON ROOF PANEL ...

Страница 7: ...s square to the existing structure and plum the lines where the screen room is to meet the exterior wall Starting 4 away from existing structure drill 5 16 holes at prox 16 O C a 1 2 on the outside of both chalk lines This location will align with the angle that will be applied in the next step Attaching screen room wall panels to existing structure may require additional materials not supplied by...

Страница 8: ...Americana Outdoors Inc 8 Screen Room Installation Guide ...

Страница 9: ...nstallation Guide CAUTION ONLY USE SELF TAPPING SCREWS ITEM AA ON THE OUTER FLANGE SIDE VIEW TO THE LEFT SHOWS EXPLODED VIEW OF SCREWS ON ONE SIDE ONLY OPPOSITE SIDE RECIEVES SCREEN PANELS SCREW HEADS WILL INTERFERE WITH SCREEN WALL PANELS ...

Страница 10: ...Installation Guide CAUTION ONLY USE SELF TAPPING SCREWS ITEM AA ON THE OUTER FLANGE SIDE VIEW TO THE LEFT SHOWS EXPLODED VIEW OF SCREWS ON ONE SIDE ONLY OPPOSITE SIDE RECIEVES SCREEN PANELS SCREW HEADS WILL INTERFERE WITH SCREEN WALL PANELS ...

Страница 11: ...VE BEEN INSERTED INTO CONCRETE PRE DRILL HOLES IN ANGLE 16 O C CENTERED ON FLANGE WHEN ATTACHING THE BOTTOM TRACKING THE FLANGE UP SIDE SHOULD BE COLINEAR TO THE CHALKLINES APPLIED TO SURFACE THIS WILL ENSURE THE SCREENS FIT IN THE SLOT CREATED ANGLE THAT MEETS PERPENDICULAR TO ONE ANOTHER MAY BE MITERED AT A 45 DEG OR FLANGE OFFSET OVERLAP BOTH OPTIONS ARE SHOWN BELOW ...

Страница 12: ...ONNECT SCREENS TOGETHER WITH ITEMS BB CC SHOWN BELOW CLAMP SCREENS FLUSH AND PLUMB AND PRE DRILL 5 16 HOLES BEFORE BOLT ACORN NUT APPLICATION ONCE ALL SCREENS ON ONE WALL ARE CONNECTED YOU MAY APPLY THE REMAINING ANGLE TEK SCREWS AA INTO SCREEN FRAME REPEAT STEP THROUGHOUT SCREEN APPLICATION IF THERE IS A FRONT BEAM TO BE APPLIED THE SCREEN SECTIONS MAY BE SHORTER BY 3 ON THE FRONT SIDE OF SCREEN ...

Страница 13: ... SCREEN ROOM AFTER WALL MOUNTING RAIL CHANNEL HAVE BEEN INSTALLED ON EXISTING STRUCTURE WALL START BY PLACING ROOF PANELS w QUICK CONNECT SNAP TOGETHER BEFORE ATTACHING WITH TEK SCREWS DD IMAGES ABOVE SHOW ROOF PANELS INSTALLED IMAGE BELOW SHOWS YUKON FASCIA TRIM BEING APPLIED IF EXISTING ROOF IS BEING USED THESE STEPS DO NOT APPLY ...

Страница 14: ...rts Americana will not provide or pay for the installation of such replacement parts Americana shall not be responsible for weather related failures damages due to faulty installation misuse or abuse of the product or for consequential damages including personal injuries or property damages There are no warranties express or implied which extend beyond the description on the face hereof How Do You...

Отзывы:

Похожие инструкции для SCREEN ROOM