Americana Outdoors, Inc.
11
Screen Room Installation Guide
STEP 1
BEFORE ATTACHING TRACKING ENSURE THAT THE PRE
-
STEP IS COMPLETED AND HOLES ARE
DRILLED AND BANTOM PLUGS HAVE BEEN INSERTED INTO CONCRETE. PRE DRILL HOLES IN ANGLE
16”
O.C. CENTERED ON FLANGE.
WHEN ATTACHING THE BOTTOM TRACKING THE FLANGE UP SIDE SHOULD BE COLINEAR TO THE
CHALKLINES APPLIED TO SURFACE. THIS WILL ENSURE THE SCREENS FIT IN THE SLOT CREATED.
ANGLE THAT MEETS PERPENDICULAR TO ONE ANOTHER MAY BE MITERED AT A 45 DEG.
-
OR–
FLANGE OFFSET OVERLAP. BOTH OPTIONS ARE SHOWN BELOW.