Tools Needed for Installation

 

 Installation Notes and Tips 

• 

Complete site preparation before beginning assembly.

 

• 

It is VERY IMPORTANT that the current footing layout is obtained from the manufacturer before 
pouring any footings or setting any anchor bolts.

 

• 

Anchor bolts are NOT included and must be furnished at the time of installation. Consult local 
building codes and the provided manufacturer

s drawing for required anchor specifications.

 

• 

We recommend using high quality stainless steel anchor bolts in areas with a corrosive 
climate.

 

• 

If the shelter is set on a concrete slab, the slab must be level so that all posts will be at the same 
elevation when mounted and anchored down.

 

• 

If the shelter is set on an unlevel surface, it will bolt together if assembled with all bolts loose. 
When the bolts are tightened, some of the steel joints may have gaps and the unit may not be 
exactly plumb. However, the strength of the structure will not be affected.

 

• 

In areas with frequent rain, the slab or footing elevation should be at least 

1” 

above the elevation of 

the surrounding landscape to prevent water from ponding around the base plate and anchor bolts.

 

• 

DO NOT attempt to assemble on a day with strong winds.

 

• 

Have assistance nearby to lift and secure parts in place.

 

• 

As is common in the erection of all types of metal structures, due to job site conditions (unlevel slabs, 
footings, etc.), slight modifications such as reaming of some holes or drilling new holes may become 
necessary and must be done on the job site.

 

• 

Predrilling holes and removing metal shavings and debris from between components before 
fastening together will help prevent rusting or staining of the surrounding surfaces.

 

• 

Cutting and drilling metal components will cause shavings which must be carefully removed by 
sweeping or brushing. If this is not done, the metal shavings will rust and stain the surface finish.

 

• 

It is recommended to lower the speed of electric drills during this installation. Installing Tek screws at 
a high RPM may cause the Tek screws to become damaged or break during installation.

 

Americana Outdoors, Inc. 

2

Screen Room Installation Guide

 

Safety Glasses

 

Tape Measure

 

Carpenters Level

 

Electric Drill

 

Screw Driver

 

Flat & Phillips

 

Ladder

 

Socket / Hex Head Driver

 

Sizes: 

1/4”,  5/16”,  3/4”,

 

1”,  1

-

1/16”

 

 Other Required Tools:  Gloves, Chalk Line, Silicone Caulking

 

 Recommended Tools:  Rubber Mallet, Carpenters Square, Pliers, Metal Hack Saw

 

NOTE: Heavier equipment such as a forklift, boom lift, or lift table may also be required.

 

Socket / Ratchet Wrench

 

Sizes: 

1/4”,  5/16”,  3/4”,

 

1”,  1

-

1/16”

 

Содержание SCREEN ROOM

Страница 1: ...r other protective material Prepare surrounding area Remove any obstructions around shelter location Shelter installation should be scheduled after all concrete and masonry work in the surrounding area is completed Assistance is required during entire assembly Proper site preparation is required Standard shade structure design does not include additional loads such as hanging heavy plants swings o...

Страница 2: ...assemble on a day with strong winds Have assistance nearby to lift and secure parts in place As is common in the erection of all types of metal structures due to job site conditions unlevel slabs footings etc slight modifications such as reaming of some holes or drilling new holes may become necessary and must be done on the job site Predrilling holes and removing metal shavings and debris from be...

Страница 3: ...oors Inc 3 Screen Room Installation Guide Note These are basic installation guidelines for our standard load units and may not be suitable to your specific installation It is important to follow all local and national building codes when installing any exterior improvement product If you have questions regarding the proper installation of any Americana product please call us toll free at 1 888 442...

Страница 4: ...Americana Outdoors Inc 4 Screen Room Installation Guide Parts List NOTE Length and quantity of parts will vary based on the size of area ALUMINUM POST BEAM SCREEN WITH RAILING SCREEN DOOR SCREEN ...

Страница 5: ...ications required at each connection point HARDWARE SHOWN ABOVE ACTUAL SIZE Americana Outdoors Inc 5 Screen Room Installation Guide Parts List NOTE Length and quantity of parts will vary based on the size of the shelter HD U BRACKET HD H BRACKET 1x1 ALUMINUM ANGLE 1 2x1 ALUMINUM ANGLE 1 4 x 2 1 4 Round Head Screw 1 4 Acorn Nut 1 4 x 4 Tek Screw 1 4 x 1 1 2 Hex Head Lag Screw 1 4 Bantom Insert Plug...

Страница 6: ...t are for the roof only You may skip this step if you already purchased or have an existing roof Roof options vary on style of pan choice Most common and Americana s top choice is the Yukon Roof Panel Other options will be displayed below YUKON FASCIA TRIM WALL MOUNTING CHANNEL CHANNEL RAIL YUKON ROOF PANEL ...

Страница 7: ...s square to the existing structure and plum the lines where the screen room is to meet the exterior wall Starting 4 away from existing structure drill 5 16 holes at prox 16 O C a 1 2 on the outside of both chalk lines This location will align with the angle that will be applied in the next step Attaching screen room wall panels to existing structure may require additional materials not supplied by...

Страница 8: ...Americana Outdoors Inc 8 Screen Room Installation Guide ...

Страница 9: ...nstallation Guide CAUTION ONLY USE SELF TAPPING SCREWS ITEM AA ON THE OUTER FLANGE SIDE VIEW TO THE LEFT SHOWS EXPLODED VIEW OF SCREWS ON ONE SIDE ONLY OPPOSITE SIDE RECIEVES SCREEN PANELS SCREW HEADS WILL INTERFERE WITH SCREEN WALL PANELS ...

Страница 10: ...Installation Guide CAUTION ONLY USE SELF TAPPING SCREWS ITEM AA ON THE OUTER FLANGE SIDE VIEW TO THE LEFT SHOWS EXPLODED VIEW OF SCREWS ON ONE SIDE ONLY OPPOSITE SIDE RECIEVES SCREEN PANELS SCREW HEADS WILL INTERFERE WITH SCREEN WALL PANELS ...

Страница 11: ...VE BEEN INSERTED INTO CONCRETE PRE DRILL HOLES IN ANGLE 16 O C CENTERED ON FLANGE WHEN ATTACHING THE BOTTOM TRACKING THE FLANGE UP SIDE SHOULD BE COLINEAR TO THE CHALKLINES APPLIED TO SURFACE THIS WILL ENSURE THE SCREENS FIT IN THE SLOT CREATED ANGLE THAT MEETS PERPENDICULAR TO ONE ANOTHER MAY BE MITERED AT A 45 DEG OR FLANGE OFFSET OVERLAP BOTH OPTIONS ARE SHOWN BELOW ...

Страница 12: ...ONNECT SCREENS TOGETHER WITH ITEMS BB CC SHOWN BELOW CLAMP SCREENS FLUSH AND PLUMB AND PRE DRILL 5 16 HOLES BEFORE BOLT ACORN NUT APPLICATION ONCE ALL SCREENS ON ONE WALL ARE CONNECTED YOU MAY APPLY THE REMAINING ANGLE TEK SCREWS AA INTO SCREEN FRAME REPEAT STEP THROUGHOUT SCREEN APPLICATION IF THERE IS A FRONT BEAM TO BE APPLIED THE SCREEN SECTIONS MAY BE SHORTER BY 3 ON THE FRONT SIDE OF SCREEN ...

Страница 13: ... SCREEN ROOM AFTER WALL MOUNTING RAIL CHANNEL HAVE BEEN INSTALLED ON EXISTING STRUCTURE WALL START BY PLACING ROOF PANELS w QUICK CONNECT SNAP TOGETHER BEFORE ATTACHING WITH TEK SCREWS DD IMAGES ABOVE SHOW ROOF PANELS INSTALLED IMAGE BELOW SHOWS YUKON FASCIA TRIM BEING APPLIED IF EXISTING ROOF IS BEING USED THESE STEPS DO NOT APPLY ...

Страница 14: ...rts Americana will not provide or pay for the installation of such replacement parts Americana shall not be responsible for weather related failures damages due to faulty installation misuse or abuse of the product or for consequential damages including personal injuries or property damages There are no warranties express or implied which extend beyond the description on the face hereof How Do You...

Отзывы:

Похожие инструкции для SCREEN ROOM