Americana Outdoors, Inc.
13
Screen Room Installation Guide
STEP 3
ROOF APPLICATION (THIS PAGE ONLY NECESSARY IF ROOF WAS PURCHASED WITH SCREEN ROOM)
AFTER WALL MOUNTING RAIL & CHANNEL HAVE BEEN INSTALLED ON EXISTING STRUCTURE WALL,
START BY PLACING ROOF PANELS w/ QUICK CONNECT SNAP TOGETHER BEFORE ATTACHING WITH
TEK SCREWS (DD). IMAGES ABOVE SHOW ROOF PANELS INSTALLED. IMAGE BELOW SHOWS YUKON
FASCIA TRIM BEING APPLIED.
IF EXISTING ROOF IS BEING USED THESE STEPS DO NOT APPLY.