15
■ Test run
Installation diagram
Nut
Water sup-
ply valve
5A
5B
E-bidet
Water supply hose 5C
1.
Turn on angle valve (5B) to open water
supply to eBidet.
Water supply
inserting part
2. Operate f
unctions
to confirm
there is no
wate
r
leakage from each part.
3. After water tank is filled with
water,
confirm water supply shuts off.
4. Confirm if shower and bidet function
operate normally:
1) Press the seat with your hand to enter sitting state.
2) Respectively press Posterior and Feminine buttons
to confi rm water fl ows from the nozzle smoothly.
3) Press Stop button.
5.
Confirm temperature
adjustment function
operates normally.
6. Seat takes approximately 15 minutes to heat.
Rotate in anti-
clockwise direction
5B
■ Power on confirmation
1.
Connect power plug to power supply
.
2.
Confirm that the power
is on.
(1)
Confirm water temp
erature
and seat temp
erature
.
indicators on side control panel turn on.
(2)
To prevent dry burning of warm water tank,
before the
test run is done, press Power
button to turn off all
indicators
!
Installation