Installation, Operation, and Maintenance
Single & Tandem Compressor Designs
20, 30, 40, 50, 60, 70, 80, 90, 100, 110, 120 Ton Configurations
WARNING
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing chiller equipment can be hazardous
and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by and unqualified person could result in
death or serious injury. When working on the equipment, observe all precautions in the literature and on the tabs, stickers, and labels that are
attached to the equipment. Servicing should only be done with power supplies switched off and locked out.
DEC. 2021
CHILLER MODULE MODELS:
AMC-20 (single circuit)
AMC-30 (tandem circuit)
Modular Series Batchwater Chillers
Содержание CHILLBATCH AMC-20
Страница 7: ...6 Product Information Table 1 Physical Data 20 60 Ton Units...
Страница 8: ...7 Product Information Table 2 Physical Data 70 120 Ton Units...
Страница 9: ...8 Physical Dimensions 20 30 Ton Units...
Страница 10: ...9 Fig 1 ECM 10 12 xxxxxA 10 12 5 Ton Units Physical Dimensions 40 50 60 Ton Units...
Страница 11: ...10 Physical Dimensions 70 80 90 Ton Units...
Страница 12: ...11 Physical Dimensions 100 110 120 Ton Units...
Страница 13: ...12 Fork Lifting...
Страница 14: ...13 Lifting Via Crane...
Страница 15: ...14 Lifting Via Crane Cont...
Страница 16: ...15 Chiller Installation and Clearances...
Страница 25: ...24 System Service and Maintenance Periods Cont...
Страница 27: ...26 Winterizing Freeze Protection Cont...
Страница 28: ...27 Module Wiring Diagram...
Страница 29: ...28 Module Panel Layout...
Страница 31: ......
Страница 32: ...1037 Old Salem Road Murfreesboro TN 37127 Phone 615 890 6985 info amgeo com www amgeo com...