12
C. DRYER ENCLOSURE REQUIREMENTS
Bulkheads and partitions
should be
made of noncombustible materials and
must be
located a minimum of
12-inches (30.48 cm), 18-inches (45.72 cm) or more is recommended for ease of installation, maintenance, and
service, above the dryer outer top, except along the front of the dryer which may be partially closed in if desired.
The clearance between the bulkhead header and the dryer
must be
a minimum of 4-inches (10.16 cm) and must
not extend more than 4-inches (10.16 cm) to the rear of the front. The bulkhead facing
must not be
closed in
ALL
the way to the top of the dryer. A 1-inch (2.54 cm) clearance is required.
NOTE:
Allowances
must be
made for opening the control door.
Dryers may be positioned sidewall to sidewall. However, a 1/16” (1.5875 mm) minimum allowance
must be
made for opening and closing of the control and lint doors. It is suggested that the dryer be positioned about 2 feet
(0.61 meters) away from the nearest obstruction for ease of installation, maintenance, and service (to be measured
from the back guard). Refer to the
illustration above
for details.
NOTE:
Air considerations are important for proper and efficient operation.
IMPORTANT:
Even though a minimum of only 12-inches (30.48 cm) is required, 18-inches (45.72
cm) or more is suggested, especially in the cases where sprinkler heads are over the
dryers. The additional clearance is also advantageous for ease of installation and
service.
Содержание AD-81 II
Страница 23: ...19 ...
Страница 59: ...ADC 113311 1 02 06 01 35 2 09 19 01 25 ...