113549 - 8
47
B. ADJUSTMENTS
7 DAYS AFTER INSTALLATION AND EVERY 6 MONTHS THEREAFTER
Inspect bolts, nuts, screws, (bearing setscrews), grounding connections, and nonpermanent gas connections (unions,
shutoff valves, and orifices
).
Motor and drive belts should be examined. Cracked or seriously frayed belts should
be replaced. Tighten loose V-belts when necessary. Complete operational check of controls and valves. Complete
operational check of ALL safety devices (door switch, lint drawer switch, sail switch, burner, and hi-limit thermostats).
30 DAYS AFTER INSTALLATION
SHUT OFF ALL POWER TO THE DRYER. Verify that the electrical connections to the motor contactors and
overloads are tight. This is done to accommodate the compression of the wires over time.
C. LUBRICATION
MONTHLY
The two (2) bearings that support the impellor/fan shaft must be lubricated. Use Shell Alvania #2 grease or its
equivalent. Generically, this grease would be described as an NLGI Grade 2 multipurpose industrial grease with a
lithium thickener and mineral base oil.
EVERY 3 MONTHS
The four (4) bearings that support the drive and idler shafts must be lubricated. Use Shell Alvania #2 grease or its
equivalent. Generically, this grease would be described as an NLGI Grade 2 multipurpose industrial grease with a
lithium thickener and mineral base oil.
EVERY 6 MONTHS
Remove the gear oil in the tumbler drive shaft gear reducer. Replace with 1.4 liters of Mobil oil DTE HH5G ISO
viscosity grade 460 or its equivalent.
Содержание AD-210
Страница 15: ...113549 8 www adclaundry com 11 1 Reassembly Instructions For Gas Dryer Shipped In Two 2 Pieces ...
Страница 17: ...113549 8 www adclaundry com 13 2 Reassembly Instructions For Steam Dryer Shipped In Two 2 Pieces ...
Страница 23: ...113549 8 www adclaundry com 19 210 STEAM DRYER 6 500 CFM 184 CMM HORIZONTALDRYERVENTING ...
Страница 66: ...ADC Part No 113549 8 04 08 22 ...