34
American Dryer Corporation
113549 - 8
a. The presence of condensate in the steam supply line will cause water hammer and subsequent heat exchanger
(steam coil) failure. The steam supply connection into the main supply line must be made within a minimum
10-inch (25.4 cm) riser. This will prevent any condensate from draining towards the dryer.
b. The steam supply line to the dryer must include a 12-inch (30.48 cm) riser along with a drip trap and check
valve. This will prevent any condensate from entering the steam coil.
c. Flexible hoses or couplings must be used. The dryer vibrates slightly when it runs and this will cause the
steam coil connections to crack if they are hard piped to the supply and return mains.
d. Shutoff valves for each dryer should be installed in the supply, return, and drip trap return lines. This will
allow the dryer to be isolated from the supply and return mains if the dryer needs maintenance work.
e. Install an inverted bucket steam trap and check valve for each unit at least 12-inches (30.48 cm) below steam
coil as close to the coil as possible.
f. The supply and return lines should be insulated. This will save energy and provide for safety of the operator
and maintenance personnel.
g. Water pockets in the supply line, caused by low points, will provide wet steam to the coil possibly causing coil
damage. ALL horizontal runs of steam supply piping should be pitched 1/4-inch (6.35 mm) for every 1 foot
(0.31 meters) back towards the steam supply header causing any condensate in the line to drain to the header.
Install a bypass trap in any low point to eliminate wet steam.
Содержание AD-210
Страница 15: ...113549 8 www adclaundry com 11 1 Reassembly Instructions For Gas Dryer Shipped In Two 2 Pieces ...
Страница 17: ...113549 8 www adclaundry com 13 2 Reassembly Instructions For Steam Dryer Shipped In Two 2 Pieces ...
Страница 23: ...113549 8 www adclaundry com 19 210 STEAM DRYER 6 500 CFM 184 CMM HORIZONTALDRYERVENTING ...
Страница 66: ...ADC Part No 113549 8 04 08 22 ...