4211-195 05-22-12
Page 2
AI
SERIES STEAM BOILER WITH T100 CONTROL
INSTALLATION INSTRUCTIONS
INDEX
SECTION
PAGE
WARNINGS and CAUTIONS
3-5
GENERAL INFORMATION
6
WATER QUALITY REQUIREMENTS
6
BOILER RATINGS
7
DIMENSIONS
8
INSTALLATION
9
BOILER
9
PLUMBING
9
WATER LINE
9
STEAM LINE
10
SAFETY VALVE
10
DRAIN
10
ELECTRICAL SERVICE
10
ROOM CONTROLS
11-12
TEMPERATURE SENSOR
11-12
STARTING THE BOILER
12-13
OPERATING INSTRUCTIONS
13-15
BOILER START
14
STEAM ROOM OPERATION
14
LIGHTS AND SWITCHES
14-15
ROUTINE MAINTENANCE
15-16
WATER LEVEL CONTROL
15
BLOWDOWN/AUTODRAIN
15-16
WIRING DIAGRAM AI12-AI24, 208/240/480V 60Hz
17
WIRING DIAGRAM AI12-AI24, 240/415V 50Hz
18
WIRING DIAGRAM AI30-AI48, 208/240/480V 60Hz
19
WIRING DIAGRAM AI30-AI48, 415V 50Hz
20
APPENDIX 1: RUN CLOCK AND AUTOBLOWDOWN CLOCK
21-22
APPENDIX 2: PRESSURE CONTROL ASSEMBLY
23-24
APPENDIX
3:
T100
MOUNTING
TEMPLATE 25-26