Mounting on a carrier vehicle
28
ZG-
B
BAG0170.2 02.21
1. Lifting of the hopper using 4 attachment points.
2. Dismount the drawbar, jack and running gear (Fig. 4/1, 2, 3).
3. Mount the ZG TRUCK on the vehicle.
4. Couple the supply lines with the vehicle.
ο
Control terminal to the on-board computer
ο
Couple the hydraulic hoses
ο
Power supply via 7-pin socket
5. Install the control terminal in the driver cab and connect with the
implement plug.
Observe that the maximum load capacity of the frame is 12000 kg!
•
To mount the ZG TRUCK on the carrier vehicle, use the mount-
ing plates under the frame and the mounting straps at the front
on the frame.
•
Use adequately dimensioned connecting elements when mount-
ing the ZG TRUCK on the carrier vehicle.
ο
Mounting plate bolted connection: At least 4x M 20 bolts
respectively.
ο
Mounting straps: Pin diameter of 40 mm.
•
Observe the permissible spreading disc height.
•
Ensure that there is enough space for the folding ladder and
access to the hydraulic block at the front of the ZG-TRUCK.
Содержание ZG-B 8200 Truck
Страница 7: ...Table of Contents ZG B BAG0170 2 02 21 7 10 11 Screw tightening torques 95 11 Hydraulic diagram 96 ...
Страница 29: ...Mounting on a carrier vehicle ZG B BAG0170 2 02 21 29 3 2 Mounting dimensions Spreading disc height ...
Страница 97: ...Hydraulic diagram ZG B BAG0170 2 02 21 97 ...
Страница 98: ......