Settings
78
XTender BAG0158.2 03.18
3. Push the collecting bag under the metering
unit.
4. Open the sluice flap.
(double sluice: only in conveyor section 2)
5. Repeat the calibration procedure according
to the software operating manual until the
desired spread rate is achieved.
6. Remove the collection bag.
7. Close the sealing flap under the metering
unit.
Содержание XTender 2200
Страница 105: ...Cleaning maintenance and repair XTender BAG0158 2 03 18 105 12 7 Hydraulic diagram ...
Страница 107: ...Cleaning maintenance and repair XTender BAG0158 2 03 18 107 ...
Страница 108: ......