
Chapter
4
49
ML-7 Series/ML-9001A
4.5 FC-LD (Oscillation Unit) Inspection and Replacement
20
Attach the FC-LD insulating cover.
After FC-LD replacement, fit the front
of the cover into the area circled in
the photo, attaching the cover from
above.
21
Slide the cover as shown by the
arrow to insert it. Secure it with six
screws on both sides.
22
Attach the carrying handle on top with four hex screws.
・
When starting the equipment for the first time after FC-LD replacement, reset the
total LD time and enter the values for the LD wavelength and current limit. Failure to
do this may impair laser output efficiency. For details, refer to the Operating Unit
manual.
・
Using the same current value after FC-LD replacement as before replacement
poses a risk of damage to oscillator parts due to excessive laser output. After FC-
LD replacement, always set the current
to “Maximum Setting Current Value”
indicated on the seal attached to the FC-LD.
Used FC-LDs can be reconditioned to their original performance levels for a fee.
Contact us for further details.
Содержание ML-7 Series
Страница 1: ...Installation Maintenance Z11OM1158223 20 LD Pumped Laser Marker ML 7 Series ML 9001A OPERATION MANUAL...
Страница 4: ......
Страница 8: ...4 ML 7 Series ML 9001A Contents...
Страница 43: ...Chapter 4 39 ML 7 Series ML 9001A 4 3 Air Filter Inspection and Replacement 5 Attach the air filter cover...
Страница 82: ...Chapter 4 78 ML 7 Series ML 9001A Chapter 4 Maintenance...
Страница 83: ...Appendix...