background image

Assembly instructions BR 133-3 to 139-3   

            Status 03/2022 

     Former instructions lose their validity.

   

7 / 14

   Align  an 

iso-floor with steel longitudinal supports

  so  that  the 

screw thread inserts in the floor are located over the elongated holes 
of the longitudinal supports (distance according to type sheet). The 
separation distance to the driver cab is absolutely to be adhered to. 

Tip:

  Use  a  mandrel  (Fig.  3213)  in  order  to  bring  the  bores  of  the 

longitudinal supports in line with those of the floor. 

   Insert the screws MD100354 into the bores and screw them down 

with several turns of the thread. If they can be screwed down with-
out impairment of the freedom of motion, tighten them crosswise 
with the required torque (Fig. 3214).

   Align the rear longitudinal support close-off to the hole pattern in 

the floor. Use a mandrel to check whether the hole pattern in the 
longitudinal support is in line with the bore in the floor (Fig. 3215). 

3.3 Assembling of the side walls

 

 Lift with a suitable lifting aid (crane with appropriate hoisting 

 

 

      gear, vacuum cross beam or lifting plate) the 1st side wall in the 

 

 

          centre of gravity (Fig. 331).

Observe the safety instructions!

Tip:

  It is best to fix the rear walls with glue pliers in order to prevent 

damage to the side wall.

   Ensure that no cables are present between connection points (dan-

ger of crushing of the cables). They must hang down freely on the 
beginning and end of the wall (Fig. 330 a/b).

   As with the front-side wall assembly, set the lower chord of the wall 

diagonally (approx. 10-15°C) into the floor profile (Fig. 331/324). 

   Rotate the module assembly screws MD 100318 into the appropriate 

bores in order to fix the latching point (with MD 110044), and tighten 
them by several turns of the thread (Fig. 332). With the bedding of the 
side wall, the corner pillar touches the frame cross beam (Fig. 333)
Further assembly is not hindered by this.

Attention:

 

 Before  the  raising  of  the  side  wall,  the  front  wall 

should stand vertically and the corner pillar overlap 
the front-side wall panel. 

   Raise the side wall up to the second latching point until it engages 

with a noise ("click") (Fig. 334/336). 

   Visually  check  whether  the  nose  has  engaged  in  the  profile  and 

whether a clearance still exists, in particular in the side door area. 
Where appropriate, press down in order to ensure engagement. Once 
again, check for a flush line and gap dimensions (Fig. 334/327). 

   The frame pillar should now fit flush with the frame cross beam and 

both are at right angle to each other below (Fig. 335). Now tight-
en the screws used at the beginning securely with the appropriate 
torque.

   In the interior of the box, fix all walls with the module assembly 

screws for the interior area MD 100224 (Fig. 337). 

Attention:

 

  Unlike those for the outer area (MD100318), these screws  
  have no gasket and are provided with a cylindrical 
head.

•   

     Proceed with the assembly of the 2nd side wall just like with 

                     the 1st side wall (Fig. 338 /339). 

 Fig. 3213

 Fig. 3214

 Fig. 3215

 Fig. 330a

 Fig. 330b

 Fig. 332

 Fig. 331

 Fig. 333

 Fig. 339

 Fig. 334

 Fig. 336

 Fig. 337

 Fig. 338

 Fig. 335

Содержание BR 13x-3

Страница 1: ...ead these instructions carefully ad completely before commencing the installation MA13X3 ENGL_032019 AluTeam Fahrzeugtechnik GmbH Brockhagener Str 88 D 33649 Bielefeld Tel 49 0 521 41 73 11 0 Fax 49 0 521 41 73 11 90 E Mail info aluteam de www aluteam de 03 22 ...

Страница 2: ...instructions described here particularly the following warning notes the guarantee otherwise expires Coloured representations serve for illustration only Get in touch with us immediately in case of uncertainties 1 1Checking the scope of delivery Check the shipment against the enclosed packing list for com pleteness Notify any damage incurred during transit immediately to the delivering forwarding ...

Страница 3: ...e packing straps first The individual components or groups are attached with a red packing strap Secure the part to be taken out against tipping over before cutting the packing strap Fig 133 134 In case of utilisation of an assembly carriage secure it against rolling away Provided that you raise the floor over the airline rails using a mini mum of 2 double stud fittings for that with sufficient lo...

Страница 4: ... 24 hours at 20 C 2 2 Required tools and equipment Gather the following equipment before assembly Tape measure 10 m Precision compressed air or cordless screwdriver e g Fein Accutec ASM12 12 Screwdriver bit Tx 30 according to ISO 1173 hard and tough version drive min 70 mm long MH 170107 possibly extension for screwdriver bits Torque wrench up to 200 Nm Carrying belts with double stud fittings 10 ...

Страница 5: ...h cornering load changes or uneven loading are transferred to the structure This can lead to cracks in the sub structure and in the set up structure Possible adaptation work such as e g bores are the responsibility of the ve hicle constructor Now measure again and check the hole separation dimension x and the diagonal dimension y If required re adjust If the dimensions are consistent first screw t...

Страница 6: ...ixed at the beginning and push floor and assembled front wall carefully to the driver cab up to reaching the parallel driver cab separation distance Fig 328 In order to place the module assembly centrally and to prevent a side misalign ment of the floor one fitter per vehicle side must push Danger Protect the driver cab against damage with suitable means Position the floor in longitudinal and tran...

Страница 7: ...0 15 C into the floor profile Fig 331 324 Rotate the module assembly screws MD 100318 into the appropriate boresinordertofixthelatchingpoint withMD110044 andtighten thembyseveralturnsofthethread Fig 332 Withthebeddingofthe side wall the corner pillar touches the frame cross beam Fig 333 Further assembly is not hindered by this Attention Before the raising of the side wall the front wall should sta...

Страница 8: ...ntred on the frame pillars Fix the nodes in the pillars hand tight with flat head screws M 10 MD 100329 Fig 344 345 Screw the side wall front wall to the roof with the module assem bly screws MD 100224 until the required torque 10 Nm 1 Nm is reached Fig 346 3 5 Connection of the attached electrics The cable connections of the kits BR13x 3 can be mounted very simply as follows For the cabling of th...

Страница 9: ...ig 361 Tighten the screws of the frame nodes M 10 x 20 MD 100332 and the bottom frame cross beam screws M 10 x 60 MD 100328 with the correct torque no impact screwdriver The cross beam and the rear surfaces of the pillars must be flush Fig 362 Take the fittings out of the roof assembly strips Close the tailgate in order to check the fit accuracy Set these up as appropriate according to the door de...

Страница 10: ...eal the vertical gap in the front wall between the lower chord and the two front corner pillars Fig 376 with the sealant included in the kit Provide sealing in the interior of the box in the area of the frame cross beam and the front side corners Fig 377 378 Smooth off all sealing using only polishing agent or water without soap additives 3 8 Optional supplementary equipment Unlike the model range...

Страница 11: ...upward Use the holes in the brackets as a drill template and drill the fenders ScrewthecomponentstogetherwiththescrewsMD100265 washers MD 110001 nuts MD 120001 Secure the fender bracket with the threaded inserts MD 100354 and the screws removed at the beginning to the cross beams Align the fenders centrally over the running contact surface of the wheel Check if the tyre can move freely and correct...

Страница 12: ... paints For a secure adhesion get in touch with the paint supplier especially concerning the primer Untreated and zinc coated profiles are to be treated with a suitable primer before painting The temperature in the painting cubicle may not exceed 60 C Pay attention in particular to the corrosion protection in case of subsequently attached component parts or modified AluTeam com ponents In particul...

Страница 13: ...ur responsible sales repre sentative or call us at 49 0 521 41 73 11 10 Please send e mails to info aluteam de You can remove the metallic layers from the foam core and have them recycled together with aluminium via the scrap trade The same applies to the steel and or stainless steel components of the frames A PUR foam core can be burned in thermal waste treatment systems without contaminating the...

Страница 14: ...50027 for the riveting of the rear roof corners For LBW kits tail top gate with gas pressure spring and mounting screws MD 100058 and material to fix the flaps on the sides de pending on the type of flap Inside bracket front and rear for 14 31 mm walls MA 100068 MA 100069 R MA 100069 L including fastening screws MD 100057 Module assembly screw M 6 x 21 5 self locking geomet coated MD 100224 Flat h...

Отзывы: