checking the circuit breaker maintenance counters. For this reason, maintenance checks should also
be performed locally at the substation.
Caution: Before carrying out any work on the equipment you should be
familiar with the contents of the Safety Section or the Safety
Guide Pxxx-SG-4LM-1 and the ratings on the equipment’s
rating label.
Opto-Isolators
Check the opto-inputs by repeating the commissioning test detailed in the Commissioning chapter.
Output Relays
Check the output relays by repeating the commissioning test detailed in the Commissioning chapter.
Measurement Accuracy
If the power system is energised, the measured values can be compared with known system values to
check that they are in the expected range. If they are within a set range, this indicates that the A/D
conversion and the calculations are being performed correctly. Suitable test methods can be found in
Commissioning chapter.
Alternatively, the measured values can be checked against known values injected into the device
using the test block, (if fitted) or injected directly into the IED's terminals. These tests will prove the
calibration accuracy is being maintained.
Replacing the Unit
If your product should develop a fault while in service, depending on the nature of the fault, the error
codes will be generated which can be viewed on the relay HMI. First step is to take actions as
suggested in the Troubleshooting section of this manual. In the unlikely event that the problem persist
or lies with the wiring and/or terminals, then you must replace the complete device, rewire and re-
commission the device.
Once the unit has been reinstalled, it should be re-commissioned.
Caution: If the repair is not performed by an approved service centre,
the warranty will be invalidated.
Caution: Before carrying out any work on the equipment, you should
be familiar with the contents of the Safety Information section of this
guide or the Safety Guide Pxxx-SG-4LM-1 as well as the ratings on
the equipment’s rating label. This should ensure that no damage
is caused by incorrect handling of the electronic components.
Warning: Before working at the rear of the unit, isolate all voltage and
current supplying it.
Note:
P15D does not support automatic current transformer shorting .Hence for safety reasons, CT
terminals to be shorted when the terminal block is removed.
Содержание MiCOM P50 Agile P15D
Страница 2: ......
Страница 3: ...P50 Agile P15D 1 Introduction P15D EN TM B 1 1 INTRODUCTION CHAPTER 1...
Страница 4: ...1 Introduction P50 Agile P15D 1 2 P15D EN TM B...
Страница 8: ...1 Introduction P50 Agile P15D 1 6 P15D EN TM B 2 3 Ordering information Figure 1 Ordering Information...
Страница 9: ...SAFETY INFORMATION CHAPTER 2...
Страница 10: ...Safety Information Pxxx 2...
Страница 21: ...P50 Agile P15D 3 Hardware Design P15D EN TM B 3 1 HARDWARE DESIGN CHAPTER 3...
Страница 22: ...3 Hardware Design P50 Agile P15D 3 2 P15D EN TM B...
Страница 28: ...3 Hardware Design P50 Agile P15D 3 8 P15D EN TM B...
Страница 29: ...P50 Agile P15D 4 Front Panel P15D EN TM B 4 1 FRONT PANEL CHAPTER 4...
Страница 30: ...4 Front Panel P50 Agile P15D 4 2 P15D EN TM B...
Страница 35: ...P50 Agile P15D 4 Front Panel P15D EN TM B 4 7 Figure 2 USB Port...
Страница 36: ...4 Front Panel P50 Agile P15D 4 8 P15D EN TM B...
Страница 37: ...P50 Agile P15D 5 Configuration P15D EN TM B 5 1 CONFIGURATION CHAPTER 5...
Страница 38: ...5 Configuration P50 Agile P15D 5 2 P15D EN TM B...
Страница 129: ...P50 Agile P15D 5 Configuration P15D EN TM B 5 93 2 4 18 2 View Error Log V00405 VIEW RECORDS Error Log 000 Fault Record...
Страница 130: ...5 Configuration P50 Agile P15D 5 94 P15D EN TM B...
Страница 131: ...P50 Agile P15D 6 Protection Functions P15D EN TM B 6 1 PROTECTION FUNCTIONS CHAPTER 6...
Страница 132: ...6 Protection Functions P50 Agile P15D 6 2 P15D EN TM B...
Страница 141: ...P50 Agile P15D 7 Protection Parametre Settings P15D EN TM B 7 1 PROTECTION PARAMETRE SETTINGS CHAPTER 7...
Страница 142: ...7 Protection Parametre Settings P50 Agile P15D 7 2 P15D EN TM B...
Страница 154: ...7 Protection Parametre Settings P50 Agile P15D 7 14 P15D EN TM B...
Страница 155: ...P50 Agile P15D 8 Monitoring Control P15D EN TM B 8 1 MONITORING CONTROL CHAPTER 8...
Страница 156: ...8 Monitoring Control P50 Agile P15D 8 2 P15D EN TM B...
Страница 162: ...8 Monitoring Control P50 Agile P15D 8 8 P15D EN TM B...
Страница 163: ...P50 Agile P15D 9 External Battery Backup P15D EN TM B 9 1 EXTERNAL BATTERY BACKUP CHAPTER 9...
Страница 164: ...9 External Battery Backup P50 Agile P15D 9 2 P15D EN TM B...
Страница 167: ...P50 Agile P15D 10 Impulse Output for Tripping Coil P15D EN TM B 10 1 IMPULSE OUTPUT FOR TRIPPING COIL CHAPTER 10...
Страница 168: ...10 Impulse Output for Tripping Coil P50 Agile P15D 10 2 P15D EN TM B...
Страница 171: ...P50 Agile P15D 11 Impulse for Flag Indicator P15D EN TM B 11 1 IMPULSE FOR FLAG INDICATOR CHAPTER 11...
Страница 172: ...11 Impulse for Flag Indicator P50 Agile P15D 11 2 P15D EN TM B...
Страница 175: ...P50 Agile P15D 12 SCADA Communications P15D EN TM B 12 1 SCADA COMMUNICATIONS CHAPTER 12...
Страница 176: ...12 SCADA Communications P50 Agile P15D 12 2 P15D EN TM B...
Страница 187: ...P50 Agile P15D 13 Installation P15D EN TM B 13 1 INSTALLATION CHAPTER 13...
Страница 188: ...13 Installation P50 Agile P15D 13 2 P15D EN TM B...
Страница 206: ...13 Installation P50 Agile P15D 13 20 P15D EN TM B...
Страница 207: ...P50 Agile P15D 14 Technical Specifications P15D EN TM B 14 1 TECHNICAL SPECIFICATIONS CHAPTER 14...
Страница 208: ...14 Technical Specifications P50 Agile P15D 14 2 P15D EN TM B...
Страница 219: ...P50 Agile P15D 15 Wiring Diagrams P15D EN TM B 15 1 WIRING DIAGRAMS CHAPTER 15...
Страница 220: ...15 Wiring Diagrams P50 Agile P15D 15 2 P15D EN TM B...
Страница 223: ......