12 SCADA Communications
P50 Agile P15D
12-8
P15D/EN TM/B
This section should provide sufficient detail to enable understanding of the standard at a level required
by most users.
The IEC 60870-5-103 interface is a master/slave interface with the device as the slave device. The
device conforms to compatibility level 2, as defined in the IEC 60870-5-103.standard.
The following IEC 60870-5-103 facilities are supported by this interface:
•
Initialization (reset)
•
Time synchronisation
•
Event record extraction
•
General interrogation
•
Cyclic measurements
•
General commands
•
Disturbance record extraction
2.2.2
Physical Connection and Link Layer
There is just one option for IEC 60870-5-103:
•
Rear serial port 1- for permanent SCADA connection via RS485
The IED address and baud rate can be selected using the front panel menu or with P50 Agile
configurator.
2.2.3
Initialisation
Whenever the device has been powered up, or if the communication parameters have been changed,
a reset command is required to initialize the communications. The device will respond to either of the
two reset commands; Reset CU or Reset FCB (Communication Unit or Frame Count Bit). The
difference between the two commands is that the Reset CU command will clear any unsent messages
in the transmit buffer, whereas the Reset FCB command does not delete any messages.
The device will respond to the reset command with an identification message ASDU 5. The Cause of
Transmission (COT) of this response will be either Reset CU or Reset FCB depending on the nature of
the reset command.
The relay will also produce a power up event, when the relay is powered up.
2.2.4
Time Synchronisation
The time and date can be set using the time synchronisation feature of the IEC 60870-5-103 protocol.
The device will correct the transmission delay depending on communication speed. For this,
transmission time, required for the time synchronization frame from the Master to IED, considering
current baud rate, is added in the received time If the time synchronisation message is sent as a
send/confirm message then the device will respond with a confirm message. A time synchronisation
Class 1 event will be generated/produced whether the time-synchronisation message is sent as a
send confirm or a broadcast (send/no reply) message.
2.2.5
Spontaneous Events
Events are categorized using the following information:
•
Function type
•
Information Number
Содержание MiCOM P50 Agile P15D
Страница 2: ......
Страница 3: ...P50 Agile P15D 1 Introduction P15D EN TM B 1 1 INTRODUCTION CHAPTER 1...
Страница 4: ...1 Introduction P50 Agile P15D 1 2 P15D EN TM B...
Страница 8: ...1 Introduction P50 Agile P15D 1 6 P15D EN TM B 2 3 Ordering information Figure 1 Ordering Information...
Страница 9: ...SAFETY INFORMATION CHAPTER 2...
Страница 10: ...Safety Information Pxxx 2...
Страница 21: ...P50 Agile P15D 3 Hardware Design P15D EN TM B 3 1 HARDWARE DESIGN CHAPTER 3...
Страница 22: ...3 Hardware Design P50 Agile P15D 3 2 P15D EN TM B...
Страница 28: ...3 Hardware Design P50 Agile P15D 3 8 P15D EN TM B...
Страница 29: ...P50 Agile P15D 4 Front Panel P15D EN TM B 4 1 FRONT PANEL CHAPTER 4...
Страница 30: ...4 Front Panel P50 Agile P15D 4 2 P15D EN TM B...
Страница 35: ...P50 Agile P15D 4 Front Panel P15D EN TM B 4 7 Figure 2 USB Port...
Страница 36: ...4 Front Panel P50 Agile P15D 4 8 P15D EN TM B...
Страница 37: ...P50 Agile P15D 5 Configuration P15D EN TM B 5 1 CONFIGURATION CHAPTER 5...
Страница 38: ...5 Configuration P50 Agile P15D 5 2 P15D EN TM B...
Страница 129: ...P50 Agile P15D 5 Configuration P15D EN TM B 5 93 2 4 18 2 View Error Log V00405 VIEW RECORDS Error Log 000 Fault Record...
Страница 130: ...5 Configuration P50 Agile P15D 5 94 P15D EN TM B...
Страница 131: ...P50 Agile P15D 6 Protection Functions P15D EN TM B 6 1 PROTECTION FUNCTIONS CHAPTER 6...
Страница 132: ...6 Protection Functions P50 Agile P15D 6 2 P15D EN TM B...
Страница 141: ...P50 Agile P15D 7 Protection Parametre Settings P15D EN TM B 7 1 PROTECTION PARAMETRE SETTINGS CHAPTER 7...
Страница 142: ...7 Protection Parametre Settings P50 Agile P15D 7 2 P15D EN TM B...
Страница 154: ...7 Protection Parametre Settings P50 Agile P15D 7 14 P15D EN TM B...
Страница 155: ...P50 Agile P15D 8 Monitoring Control P15D EN TM B 8 1 MONITORING CONTROL CHAPTER 8...
Страница 156: ...8 Monitoring Control P50 Agile P15D 8 2 P15D EN TM B...
Страница 162: ...8 Monitoring Control P50 Agile P15D 8 8 P15D EN TM B...
Страница 163: ...P50 Agile P15D 9 External Battery Backup P15D EN TM B 9 1 EXTERNAL BATTERY BACKUP CHAPTER 9...
Страница 164: ...9 External Battery Backup P50 Agile P15D 9 2 P15D EN TM B...
Страница 167: ...P50 Agile P15D 10 Impulse Output for Tripping Coil P15D EN TM B 10 1 IMPULSE OUTPUT FOR TRIPPING COIL CHAPTER 10...
Страница 168: ...10 Impulse Output for Tripping Coil P50 Agile P15D 10 2 P15D EN TM B...
Страница 171: ...P50 Agile P15D 11 Impulse for Flag Indicator P15D EN TM B 11 1 IMPULSE FOR FLAG INDICATOR CHAPTER 11...
Страница 172: ...11 Impulse for Flag Indicator P50 Agile P15D 11 2 P15D EN TM B...
Страница 175: ...P50 Agile P15D 12 SCADA Communications P15D EN TM B 12 1 SCADA COMMUNICATIONS CHAPTER 12...
Страница 176: ...12 SCADA Communications P50 Agile P15D 12 2 P15D EN TM B...
Страница 187: ...P50 Agile P15D 13 Installation P15D EN TM B 13 1 INSTALLATION CHAPTER 13...
Страница 188: ...13 Installation P50 Agile P15D 13 2 P15D EN TM B...
Страница 206: ...13 Installation P50 Agile P15D 13 20 P15D EN TM B...
Страница 207: ...P50 Agile P15D 14 Technical Specifications P15D EN TM B 14 1 TECHNICAL SPECIFICATIONS CHAPTER 14...
Страница 208: ...14 Technical Specifications P50 Agile P15D 14 2 P15D EN TM B...
Страница 219: ...P50 Agile P15D 15 Wiring Diagrams P15D EN TM B 15 1 WIRING DIAGRAMS CHAPTER 15...
Страница 220: ...15 Wiring Diagrams P50 Agile P15D 15 2 P15D EN TM B...
Страница 223: ......