13
2. Remove front cover of GDI and insert connector of
programing modul into GDI (via picture). On
programming modul must light on red LED
(It is flashing same way like yellow LED on GDI)
3. Run GDIset programm and setup appropriate port.
4. Program control GDI connection. After that display GSM
signal strength and voltage on GDI (back up ACU). Now
you can programm:
Monitor mode
For parametres
programming stop
firmware running in GDI.
For operation monitoring
dont press! Stop GDI
running!
Identification of seriál line
connection
After GDI voice
connection will show
voltage in GDI
After GDI voice
connection will show
GSM signal strength
Содержание GDI Bell
Страница 1: ...G S M D O O R I N T E R C O M GDI Bell User and programming manual V 2 6 ...
Страница 6: ...5 GDI Wall mounting Wall mounting assembly you make by attached screws 5mm ...
Страница 21: ...20 Item ADMIN numbers setting Field to save up to 7 ADMIN numbers ...
Страница 37: ...36 ...
Страница 40: ...39 Alphatech Technologies s r o sales alphatechtechnologies cz www alphatechtechnologies cz ...