2
Subject to change without notice | 83057000jUK – Translation of the original operating manual | ait-deutschland GmbH
Table of contents
1 About this operating manual
...................... 3
1.1 Validity ....................................................... 3
1.2 Reference documents ............................... 3
1.3 Symbols and identification markings
........ 3
1.4 Contact ...................................................... 4
2 Safety
............................................................... 4
2.1 Intended use ............................................. 4
2.2 Personnel qualifications
............................ 4
2.3 Personal protective equipment ................. 4
2.4 Residual risks
............................................ 4
2.5 Disposal .................................................... 5
2.6 Avoid damage to property ......................... 5
3 Description
...................................................... 6
3.1 Layout ....................................................... 6
3.2 Accessories............................................... 8
3.3 Function .................................................... 8
4 Operation and care
....................................... 9
4.1 Energy and environmentally aware
operation ................................................... 9
4.2 Maintenance.............................................. 9
5 Delivery, storage, transport and
installation
....................................................... 9
5.1 Scope of supply ........................................ 9
5.2 Storage .................................................... 10
5.3 Unpacking and transport
......................... 10
5.4 Installation ................................................11
6 Installation and connection
....................... 12
6.1 Dismantle the module box ...................... 12
6.2 Install the module box ............................. 14
6.3 Install the hydraulic connections ............. 14
6.4 Connect the electrical cables .................. 15
6.5 Installing the control panel ...................... 16
7 Flushing, filling and venting
...................... 17
7.1 Remove the front panel of
the module box ........................................ 17
7.2 Fill, flush and vent heat source
............... 17
7.3 Vent the circulation pump of
the heat source ....................................... 18
7.4 Flush and fill the heating and
domestic hot water charging circuit ......... 19
8 Insulate hydraulic connections
................ 20
9 Set the overflow valve
................................ 20
10 Commissioning
............................................ 21
11 Maintenance
................................................. 22
11.1 Basic principles ....................................... 22
11.2 Maintenance as required ........................ 22
11.3 Clean and flush the evaporator and
condenser ............................................... 22
11.4 Yearly maintenance ................................. 22
12 Faults
.............................................................. 22
12.1 Unlock the safety temperature limiter
..... 22
12.2 Manually unblock the circulating pumps
. 23
13 Dismantling and Disposal
......................... 23
13.1 Dismantling ............................................. 23
13.2 Disposal and Recycling ........................... 23
13.3 Removal of the buffer battery
.................. 23
Technical data / Scope of supply
............ 24
SWCV 62(H)(K)3 – SWCV 92(H)(K)3 .............. 24
SWCV 122(H)(K)3 – SWCV 162(H)(K)3 .......... 25
Performance curves
................................... 26
SWCV 62(H)(K)3 .............................................. 26
SWCV 92(H)(K)3 .............................................. 27
SWCV 122(H)(K)3 ............................................ 28
SWCV 162(H)(K)3 ............................................ 29
Dimensional drawings
................................ 30
SWCV 62(H)(K)3 – SWCV 162(H)(K)3 ............ 30
Connections ..................................................... 31
Control unit ....................................................... 32
Wall-mounted bracket
...................................... 32
Installation plans
.......................................... 33
Installation plan 1 ............................................. 33
Installation plan 2 ............................................. 34
Installation plan 3 ............................................. 35
Hydraulic integration
................................... 36
Unit variant H .................................................... 36
with separate buffer tank
.................................. 37
Unit variant K .................................................... 38
Keys hydraulic integration ................................ 39
Terminal diagrams
...................................... 40
SWCV 62(H)(K)3 – SWCV 92(H)(K)3 .............. 40
SWCV 122(H)(K)3 – SWCV 162(H)(K)3 .......... 41
Circuit diagrams
........................................... 42
SWCV 62(H)(K)3 – SWCV 92(H)(K)3 .............. 42
SWCV 122(H)(K)3 ............................................ 45
SWCV 162(H)(K)3 ............................................ 48
EC Declaration of Conformity
.................. 51