background image

38

Subject to change without notice  |  83059600lUK  |  ait-deutschland GmbH

Legend hydraulic diagramm

140304

/AT

kna

t no

it

ar

epe
S

15

pmu
p t

ae

H

1

A

External sensor

rosn
es

 r

et

a

w t

oh c

itse
mo

D

B/

WB

T

re

lio

b-li

o ro

 -

sa

G

25

sr

ot

aida

r / gn

it

aeh
 r

oo

lfr

edn
U

2

1 st

iuc

ric r

ex

i

m r

osn
es

 r

et

a

wd

ee

F

C/

1B

T

reli

ob

 doo

W

35

noi

talo

si n

oit

ar

bi

V

3

re

ti

mil eru
tare
p

mt ro

ol

F

D

redn

ily

c r

et

a

w t

o

H

45

yal

re

dn

u e

nih

ca

m pi

rts 

re

mol

yS

4

nru

ter

 la

nre

tx

e ro
sn

eS
G/

L

RT

hcti

ws eru
ss

erp

 e

nir

B

55

egan
iar

d dna
 e

ru

sol

C

5

TS

regnah

cx

e t

aeh
 loop
 gn

i

m

mi

wS

65

tsil

 g

nik

ca

p l

es

sev

 n

oisn

apx

E

6

A

Line pressure regulator valve

regnah

cx

e t

aeh
 la

mr

eh

toe

G

75

evl

av y

tefa

S

7

TRL/H

Sensor return 

(h

ydraulic module, dual

)

mets

ys n
oit

alit

ne

V

85

 e

ruso

l

C

8

97

regnah

cx

e t

aeh
 e

tal

P

95

p

mu

p n

oit

alu

cri

c g
nit

ae

H

9

Motor valve

08

redn

ily

c gn

iloo

C

16

ev

lav

 ya

w e

no 

/ev

lav

 n

rut

er n

o

N

01

Mixin

g valve

18

ro

tu

birts

id

 tc

ap

mo

C

56

no

it

aluge
r m
oo

r l

aud

ivi

dn

I

11

Sp

lit heat 

pum

p outdoor unit

28

sli

oc

na

F

66

ev

lav

 w

olfr

ev

O

21

Sp

lit heat 

pum

p indoor unit 

38

re

dni

ly

c r

et

a

w e

civ

re

s /r

alo
S

76

noi

talu

sni

 t

hgi

t

ma

et

S

31

Circulation

pum

p

48

re

dni

ly

c r

et

a

w e

civ

re

s /r

alo
S

86

p

mu

p n
oita

lu

cri

c r

eta
w e

civ

re

S

41

Switchin

g valve

    

rot

ar

eneg
 t

aeh
 dn2
 no

itc

enno

C

311

kna

t no

itc

nu

fitl

u

M

96

)e

gra
hc

sid 

1K

M( re
xi

m y

a

w-e

erh

t ti

ucri

c re
xi

M

51

eludo
m c

ilua

rd

yh l

au

D

17

re

mot

suc

 yb

 d

eil

pp

us

 les

sev

 n

oisn

apx

E

61

BT1

Outdoor tem

perature sensor

de

tnuo
m ll

a

w k

na

t r

eff

uB

27

)gn

it

aeh
( do
r gn

it

ae

H

81

BT2

Flow tem

perature sensor 

ni-

dae

l ep

iP

37

)e

gra
hc 

1K

M( re
xi

m y

a

w-ru

of ti

ucri

c re
xi

M

91

BT3

Return tem

perature sensor

rewo
tn

eV

47

)

WS(

 do
r gn

it

ae

H

02

BT6

Domestic hot water tem

perature sensor

laud
 ,r

e

wot

 cil

ua

rd

yh ,

yr

evil

ed

 f

epo
cS

57

)1

PF(

 p
mu

p n

oit

alu

cri

c tiu

cri

c r

exi

M

12

BT12

Flow tem

perature li

quefier

23

Feed circulating pump (reconnect the integrated circulating pump  in the heat pump)

76

Fresh water station

BT19

Temperature sensor immersion heater

ret

so

ob 

reta
w/r

eta
w yl

pp

us fo e
po

cS

77

dlu

fin

a

M

42

BT24

Tem

perature sensor 2nd heat 

generator

la

noitp

o r

et

so

ob r

eta
w/r

eta
w s

eir

os

se

cc

A

87

p

mup

 no

it

alu

cri

c gn

it

ae

H

52 26

 

Swi

tching 

va

lv

e (hea

ting

/ser

vice 

w

at

er)(

B = normall

y open

)

27

Heating element

28

Brine circulation pump

Comfort board

 / Expansion board

:

29

Dirt-trap 0.6 mm mesh

15

Mixer circuit three-wa

y mixer 

(MK2-3 dischar

ge

)

ro

tal

ug

er e

cn

ere

ffi

d eru
tare
p

me

T

71

)lano

it

po

gn

iloo

c r

of t

ats

o

mr

eh

t m
oo

R

001

xi

m e

nirb

 rü

f y

art-

lli

pS

03

)e

gra
hc 

2K

M( re
xi

m y

a

w-ru

of ti

ucri

c re
xi

M

91

re

mot

su

c y

de

ilppu
s s

lor

tno

C

101

hguo
rht

kae

rb l

la

W

13

)3-

2P

F( p
mu

p n

oit

alu

cri

c tiu

cri

c r

exi

M

12

)lano

it

po

( r

oti

no
m t

niop

-

we

D

201

epip

 t

eln

I

23

p

mup

 gn

it

alu

cri

c l

oop
 gn

i

m

mi

wS

22

tsil

 gn

ik

cap

 n

i e

cap

s e

cne

ref

er r

of t

ats

o

mr

eh

moo

R

301

dlu

fin

a

m e

nir

B

33

)2

K

M no

itc

nu

f gn

iloo

c( ev

lav

 r

ex

i

m ya

w-

eer

hT

44

p

mup

 t

aeh
 y

lppu
S

401

rot

cell

oc dnuo

r

G

43

74

noi

tal

la

ts

ni r

of elb
ae

vo

mer

 x

ob elu
do

m tiu

cri

c g
nilo

o

C

50

1

sei

knil

s dnuo

r

G

53

 

Ch

angeo

ve

r va

lv

e s

w

imming ba

th prepara

tion(

B = normall

y open

)

06

er

utx

i

m elo
cylg

 cif

ic

ep

S

60

1

p

mup

 gn

ir

ps 

ret

a

wdnuo
r

G

63

Ch

angeo

ve

r va

lv

cooling opera

tion(

B =

 normall

y open

)

)lano

it

po

( r

et

e

m t

ae

H

26

evla

v r

exi

m ci

tats

o

mr

eht

 / n

oitc

et

or

p dla
cS

70

1

tek

ca

rb l

la

W

73

36

ylbme
ss

a pmu

p r

alo

S

80

1

hct

i

ws w
ol

F

83

Ch

angeo

ve

r va

lv

e solar circui

t(B

 = normall

y open

)

p

mu

p n

oit

alu

cri

c g
nilo

o

C

46

deso

lc e

b t

su
m ev

lav

 

wolf

rev

O

90

1

lle

w n

oitc

uS

93

eludo
m no

it

ar

epe
s r

alo

S

07

re

wot

 cil

ua

rd

yh 

tsil

 gn

ik

ca

P

011

lle

w de
tr

ev

nI

04

3-2

 sti

ucri

c re
xi

m ro
sn

es re

ta

wd

ee

F
C/

3-2
BT

tne
mel

e gn

it

aeh
 lano

iti

dda
 r

of gn

it

nuo
M

111

tiu

cri

c gn

it

aeh
 gn

ittif

 e

sni

R

14

wol

( l

ort

no

c e

cn

ere

ffi

d eru
tare
p

met

 ,ro

sn

eS
E/

SS

T

evl

av gn

ixi

m eh
t f

o gn

ilpuo
ced

 la

mr

eh

t o

t e

cna

tsi

mu

mini

M

211

p

mup

 no

it

alu

cri

C

24

 temperature)

43

Brine / Water heat exchanger (cooling function)

TSK/E

Sensor, temperature difference control (high temperature)

44

Three-way mixer valve (cooling function MK1)

TEE/F

Sensor external energy source

45

Cap valve

46

Filler and drainage valve

48

Domestic hot water charging pump

49

Direction of groundwater flow

50

Buffer storage

Important notice !

These hydraulic diagrams are schematic representations and are for assistance only. They do not relieve of the obligation to ca

rry out appropriate planning! They do not include all necessary shut-off valves, ventilator 

fittings or safety devices. These must be incorporated in accordance with the standards and regulations applicable to the respe

ctive installation. All country-specific standards, laws and regulations must be observed! The 

tubes have to be dimensioned according to the nominal volume flow of the heat pump resp. the free pressing of the integrated ci

rculating pump. For detailed information and advice please contact our local sales partner!

Содержание LWAV 122R3

Страница 1: ...UK 83059600lUK Air Water Heat Pumps Outdoor installation Operating Manual LWAV series...

Страница 2: ...nting the heating circuit 13 9 Insulation of hydraulic connections 13 10 Setting the overflow valve 13 11 Commissioning 14 12 Maintenance 15 12 1 Basic principles 15 12 2 Maintenance as required 15 12...

Страница 3: ...g manual of the heating and heat pump controller Short description of the heat pump controller Operating manual of the extension board accessories Log book 1 3 Symbols and markings Identification of w...

Страница 4: ...rienced in handling the product and who are re sponsible for safety Children must not play with the product The product may only be opened by qualified personnel All instructions and information in th...

Страница 5: ...d Improper action Requirements for minimum scale and corrosion dam age in hot water heating systems Professional planning and commissioning Closed system with regard to corrosion Integration of an ade...

Страница 6: ...ation site 5 Carrying straps with openings for carrying 3 2 Design NOTE This section essentially names the compo nents relevant for fulfilling the tasks described in this operating manual The heat pum...

Страница 7: ...or for heating the building The temperatures required and the use are controlled by the heat pump controller Any required reheating support in screed drying or increase in the domestic hot water temp...

Страница 8: ...rt the unit to the place of installation in packaged for and secured on a wooden pallet 4 2 Care Wipe down the outside of the unit only using a damp cloth or cloth with mild cleaning agent washing up...

Страница 9: ...down safely 4 Break off the protruding links on the polystyrene cross pieces 1 Tensioning straps with openings for carrying 2 Polystyrene links 3 Screws on the fan module Carrying the unit transport...

Страница 10: ...heat pump is permeable to water Unit installation 1 Align the unit base horizontally using the spirit level and attach it to a strip foundation or full area foun dation with 4 screws 2 Unscrew the 4 l...

Страница 11: ...quired volume of which depends on your model Technical data scope of supply page 17 9 The lines for the heating are fastened to the wall or ceiling via a fixed point 1 Heating water supply 2 Condensat...

Страница 12: ...EVS Load and bus connector Cable on site maximum cable length of 30 m The bus cable must be a shielded cable of at least 4 x 0 5 mm As load line For the 12 kW unit a 5 x 2 5 mm cable with protective c...

Страница 13: ...geover valve via the venting programs As a result it is not necessary to remove the valve motor 1 Vent the system at the highest point 2 Vent the heat pump at the hydraulic connection set 9 Insulation...

Страница 14: ...supply company has been notified of operation of the heat pump system 9 The system is air free 9 Installation check using the general checklist has been completed successfully 1 Ensure that the follo...

Страница 15: ...ich for example occur when applying house insulation with polysty rene balls through packaging material foils films car tons etc through foliage snow icing or similar weath er related deposits through...

Страница 16: ...out the cause of the malfunction via the diag nostic program of the heating and heat pump con troller Consult the local partner of the manufacturer or the factory s customer service Have the fault me...

Страница 17: ...n series I Min volume separation buffer tank l h l l 1200 60 100 1900 100 200 Free pressing Pressure loss Flow rate bar bar l h 0 14 1200 0 2 1900 Max allowable operating pressure bar 3 3 Circulation...

Страница 18: ...020 823290 c 0 1 2 3 4 5 6 7 8 9 10 25 20 15 10 5 0 5 10 15 20 25 30 35 Temp C Qh min max kW 35 C 55 C 0 00 0 05 0 10 0 15 0 20 0 25 0 30 0 0 5 1 1 5 2 2 5 3 m h pmax bar 15 20 25 30 35 40 45 50 55 60...

Страница 19: ...18 Peplau 10 08 2018 Zeichnungsnummer 823290 0 1 2 3 4 5 6 7 8 9 10 10 15 20 25 30 35 40 45 TempWS C Q0 min max kW 7 C 18 C 0 00 0 05 0 10 0 15 0 20 0 25 0 30 0 0 5 1 1 5 2 2 5 3 VKW m h pmax bar 5 10...

Страница 20: ...9 10 11 12 13 14 25 20 15 10 5 0 5 10 15 20 25 30 35 Temp C Qh min max kW 35 C 55 C 0 00 0 05 0 10 0 15 0 20 0 25 0 30 0 0 5 1 1 5 2 2 5 3 m h pmax bar 15 20 25 30 35 40 45 50 55 60 65 25 20 15 10 5...

Страница 21: ...lau 10 08 2018 Zeichnungsnummer 823291 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 10 15 20 25 30 35 40 45 TempWS C Q0 min max kW 7 C 18 C 0 1 2 3 4 5 6 7 8 9 10 10 15 20 25 30 35 40 45 TempWS C Pel min max kW...

Страница 22: ...inde 2 Kondensatablauf HT Rohr DN40 DN40 3 Stecker f r Last und Modbuskabel 4 Heizwasser Eintritt R cklauf G 1 Au engewinde G 1 Au engewinde 4 3 2 1 A B C D E F Schutzvermerk ISO 16016 beachten Dimens...

Страница 23: ...rderansicht B2 Ventilatormodul Seitenansicht von links A1 B1 B2 A2 Legende D819495 2a Alle Ma e in mm Technische nderungen vorbehalten 4 3 2 1 A B C D E F 4 3 2 1 Schutzvermerk ISO 16016 beachten Dime...

Страница 24: ...m glich keine wasserf hrenden Leitungen Gehwege ungeeignete Bepflanzungen FS Freiraum f r Servicezwecke LR Luftrichtung OKB Oberkante Boden FA Fertigau enfassade FA OKB OKB FA FA FA FA 4 3 2 1 A B C...

Страница 25: ...t R cklauf 3 Kondensatablaufrohr DN 40 8 Haube vertikales Anschlussset 9 Bodenteil Haube OKB Oberkante Boden E OKB OKB 4 3 2 1 A B C D E F 4 3 2 1 Zus Schutzvermerk ISO 16016 beachten Connection set I...

Страница 26: ...Fundament darf keinen K rperschallkontakt zum Geb ude haben OKF Oberkante Fundament GK Ger tekontur OKB Oberkante Boden 16 Leerrohr f r Bus Kabel 17 Leerrohr f r Elektrokabel 18 Heizwasser Vor und R c...

Страница 27: ...Fundament GK Ger tekontur OKB Oberkante Boden 16 Leerrohr f r Bus Kabel 17 Leerrohr f r Elektrokabel 18 Heizwasser Vor und R cklaufleitung Das Fundament darf keinen K rperschallkontakt zum Geb ude ha...

Страница 28: ...498 1 Technische nderungen vorbehalten Alle Ma e in mm B Seitenansicht von links OKFB FA 4 B LRO OKFB W 125 10 120 min 120 min 120 min 400 50 orizontales_Anschlussset_WDFAV SLDDRW 819498_Horizontales_...

Страница 29: ...nderungen vorbehalten Alle Ma e in mm B Seitenansicht von links C Draufsicht OKFB OKB 4 11 5 FA OKF 125 175 10 400 50 120 min 5 11 865 50 755 10 420 10 819498_Horizontales_Anschlussset_WDFAV SLDDRW 81...

Страница 30: ...che nderungen vorbehalten Alle Ma e in mm B Seitenansicht von links C Draufsicht OKFB 4 3 2 1 A B C D E F 4 3 2 1 Zust Schutzvermerk ISO 16016 beachten 819498_Horizontales_Anschlussset_WDFAV SLDDRW 81...

Страница 31: ...14 70 11 GK 60 14 70 11 GK 60 4 3 2 1 A B C D E F 4 3 2 1 Zust Schutzvermerk ISO 16016 beachten B C C OKB OKF 14 Kondensatablaufrohr DN100 bauseits 11 Fundament frostsicher C Draufsicht B Seitenansic...

Страница 32: ...b served facing away from the coast prevailing wind direction 9 in a sheltered area near a wall 9 not in open areas 9 not in sandy surroundings to avoid the influx of sand on the seaward side 9 in an...

Страница 33: ...abgeleitet ist auf eine Verlegung mit einem Gef lle zu achten In allen F llen Abbildung 1a und Abbildung 1b muss gew hrleistet sein dass das Kondenswasser frostfrei abgef hrt wird 1b 1a 1c 4 3 2 1 A B...

Страница 34: ...keine zus tzlichen Abflussleitungen angeschlossen werden In allen F llen Abbildung 2a muss gew hrleistet sein dass das Kondenswasser frostfrei abgef hrt wird 2a 4 3 2 1 A B C D E F 4 3 2 1 a Zu Schut...

Страница 35: ...without notice 83059600lUK ait deutschland GmbH LWAV with hydraulic station T 102 T 100 2 66 11 D 101 12 M 24 7 25 HUP 54 50 75 111 26 BUP A B 46 5 8 8 B TBW ZWE 46 5 46 62 12 1 104 3 3 31 31 A TA 83...

Страница 36: ...59600lUK ait deutschland GmbH 54 B TBW 111 8 8 B A 26 BUP 8 8 ZWE 6 M 24 7 5 8 46 71 38 62 23 ZUP T 102 T 100 2 66 11 D 101 H TRL 5 12 12 8 8 50 111 1 104 3 3 31 31 A TA 8371234 8371234 LWAV with buff...

Страница 37: ...schland GmbH LWAV with separation buffer tank 66 11 8 8 8 10 9 HUP D 101 T 102 T 100 2 66 11 8 8 8 10 21 FP1 C TB1 15 MK1 D 101 T 102 T 100 54 B TBW 111 8 8 8 8 B A 26 BUP 18 ZWE 61 G TRL 111 8 10 23...

Страница 38: ...mfort board Expansion board 29 Dirt trap 0 6 mm mesh 15 Mixer circuit three way mixer MK2 3 discharge r o t a l u g e r e c n e r e f f i d e r u t a r e p m e T 7 1 l a n o i t p o g n i l o o c r o...

Страница 39: ...BP1 F2 BP1 BP2 F1 BP2 BP Q10 R20 C1 X10 X100 1 N PE 230V 50Hz F6 X400 1 G1 X300 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 1 2 3 4 5 6 7 AIT 817450 Stromlaufplan ait deutschland GmbH PEP01...

Страница 40: ...X15 B11 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 2 2 3 4 5 6 7 AIT 817450 Stromlaufplan ait deutschland GmbH PEP011 2017 M 017 2018 19 07 2017 13 04 2018 AP AP z21 Mod A Ven 1 B8 Mod B V...

Страница 41: ...BP2 Q10 RF1 X10 X100 3 N PE 400V 50Hz F6 X400 1 G1 X300 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 1 2 3 4 5 6 7 AIT 817451 Stromlaufplan ait deutschland GmbH PEP011 2017 31 07 2017 AP U...

Страница 42: ...XE R6 R2 B10 X15 B11 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 2 2 3 4 5 6 7 AIT 817451 Stromlaufplan ait deutschland GmbH PEP011 2017 31 07 2017 AP Mod A Ven 1 B8 Mod B Ven 1 B8 Mod A 1...

Страница 43: ...79P41 15213141 15212501 EN 60335 2 40 2014 II A1 ait deutschland GmbH Industrie Str 3 93359 Kasendorf Germany Designation of the device s Number Heat Pump EC Declaration of Conformity 2014 35 EU 813 2...

Страница 44: ...ait deutschland GmbH Industriestra e 3 D 95359 Kasendorf E info alpha innotec de W www alpha innotec de alpha innotec an ait deutschland GmbH brand UK...

Отзывы: