The “Set bypass valve” menu item is set by default to 

“No”. The overflow valve adjustment function is deac-

tivated. 

 

The UWP control signal is the indication of the 

currently required pump capacity in %

 

If the flow rate is the current flow rate (measuring 

ac/- 200 l/h)

1.  Fully open the overflow valve, close the heating 

circuits

2.  If the “Set bypass valve” menu item is set from 

“No” to “Yes”, the circulation pump is activated 

with 100% – and the pump starts up.

3.  If the control signal UWP reaches 100%, close 

the overflow valve to the extent that the maximum 

flow rate (

 “Technical data / scope of supply”, 

page 17) can be ensured.

1  Rotary-push button

2  Overflow valve

4.  If you exit the “Set bypass valve” menu or at the 

latest after one hour, the circulation pump switch-

es back to standard regulation

5.  Open valves to heating circuit.

11  Commissioning

 CAUTION

Prior to commissioning the unit, the fan 

protection grilles must be mounted and the 

facing panels closed.

 

Relevant planning & design data of the system is 

documented in full.

 

The relevant energy supply company has been 

notified of operation of the heat pump system.

 

The system is air-free.

 

Installation check using the general checklist has 

been completed successfully.

1.  Ensure that the following points are fulfilled com-

pletely:

 

Right-hand (clockwise) rotating load supply field is 

available at the compressor

 

The system is installed and mounted according to 

this operating manual

 

The electrical installation has been carried out 

properly according to this operating manual and 

the local regulations

 

The power supply for the heat pump is equipped 

with an all-pole circuit-breaker with at least 3 mm 

contact spacing (IEC 60947-2)

 

The tripping current is complied with

 

The heating circuit has been flushed and vented

 

All shut-off devices of the heating circuit are open

 

The pipe systems and components of the system 

are tight

2.  Carefully fill in and sign the notice of completion 

for the heat pump systems.

3.  In Germany: Send notice of completion for heat 

pump systems and general checklist to the man-

ufacturer’s factory customer service depart-

ment.   

In other countries: Send notice of completion for 

heat pump systems and general checklist to the 

manufacturer’s local partner.

4.  Arrange for the heat pump system to be com-

missioned by the manufacturer’s authorised after 

sales service for a fee.

Содержание LWAV 122R3

Страница 1: ...UK 83059600lUK Air Water Heat Pumps Outdoor installation Operating Manual LWAV series...

Страница 2: ...nting the heating circuit 13 9 Insulation of hydraulic connections 13 10 Setting the overflow valve 13 11 Commissioning 14 12 Maintenance 15 12 1 Basic principles 15 12 2 Maintenance as required 15 12...

Страница 3: ...g manual of the heating and heat pump controller Short description of the heat pump controller Operating manual of the extension board accessories Log book 1 3 Symbols and markings Identification of w...

Страница 4: ...rienced in handling the product and who are re sponsible for safety Children must not play with the product The product may only be opened by qualified personnel All instructions and information in th...

Страница 5: ...d Improper action Requirements for minimum scale and corrosion dam age in hot water heating systems Professional planning and commissioning Closed system with regard to corrosion Integration of an ade...

Страница 6: ...ation site 5 Carrying straps with openings for carrying 3 2 Design NOTE This section essentially names the compo nents relevant for fulfilling the tasks described in this operating manual The heat pum...

Страница 7: ...or for heating the building The temperatures required and the use are controlled by the heat pump controller Any required reheating support in screed drying or increase in the domestic hot water temp...

Страница 8: ...rt the unit to the place of installation in packaged for and secured on a wooden pallet 4 2 Care Wipe down the outside of the unit only using a damp cloth or cloth with mild cleaning agent washing up...

Страница 9: ...down safely 4 Break off the protruding links on the polystyrene cross pieces 1 Tensioning straps with openings for carrying 2 Polystyrene links 3 Screws on the fan module Carrying the unit transport...

Страница 10: ...heat pump is permeable to water Unit installation 1 Align the unit base horizontally using the spirit level and attach it to a strip foundation or full area foun dation with 4 screws 2 Unscrew the 4 l...

Страница 11: ...quired volume of which depends on your model Technical data scope of supply page 17 9 The lines for the heating are fastened to the wall or ceiling via a fixed point 1 Heating water supply 2 Condensat...

Страница 12: ...EVS Load and bus connector Cable on site maximum cable length of 30 m The bus cable must be a shielded cable of at least 4 x 0 5 mm As load line For the 12 kW unit a 5 x 2 5 mm cable with protective c...

Страница 13: ...geover valve via the venting programs As a result it is not necessary to remove the valve motor 1 Vent the system at the highest point 2 Vent the heat pump at the hydraulic connection set 9 Insulation...

Страница 14: ...supply company has been notified of operation of the heat pump system 9 The system is air free 9 Installation check using the general checklist has been completed successfully 1 Ensure that the follo...

Страница 15: ...ich for example occur when applying house insulation with polysty rene balls through packaging material foils films car tons etc through foliage snow icing or similar weath er related deposits through...

Страница 16: ...out the cause of the malfunction via the diag nostic program of the heating and heat pump con troller Consult the local partner of the manufacturer or the factory s customer service Have the fault me...

Страница 17: ...n series I Min volume separation buffer tank l h l l 1200 60 100 1900 100 200 Free pressing Pressure loss Flow rate bar bar l h 0 14 1200 0 2 1900 Max allowable operating pressure bar 3 3 Circulation...

Страница 18: ...020 823290 c 0 1 2 3 4 5 6 7 8 9 10 25 20 15 10 5 0 5 10 15 20 25 30 35 Temp C Qh min max kW 35 C 55 C 0 00 0 05 0 10 0 15 0 20 0 25 0 30 0 0 5 1 1 5 2 2 5 3 m h pmax bar 15 20 25 30 35 40 45 50 55 60...

Страница 19: ...18 Peplau 10 08 2018 Zeichnungsnummer 823290 0 1 2 3 4 5 6 7 8 9 10 10 15 20 25 30 35 40 45 TempWS C Q0 min max kW 7 C 18 C 0 00 0 05 0 10 0 15 0 20 0 25 0 30 0 0 5 1 1 5 2 2 5 3 VKW m h pmax bar 5 10...

Страница 20: ...9 10 11 12 13 14 25 20 15 10 5 0 5 10 15 20 25 30 35 Temp C Qh min max kW 35 C 55 C 0 00 0 05 0 10 0 15 0 20 0 25 0 30 0 0 5 1 1 5 2 2 5 3 m h pmax bar 15 20 25 30 35 40 45 50 55 60 65 25 20 15 10 5...

Страница 21: ...lau 10 08 2018 Zeichnungsnummer 823291 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 10 15 20 25 30 35 40 45 TempWS C Q0 min max kW 7 C 18 C 0 1 2 3 4 5 6 7 8 9 10 10 15 20 25 30 35 40 45 TempWS C Pel min max kW...

Страница 22: ...inde 2 Kondensatablauf HT Rohr DN40 DN40 3 Stecker f r Last und Modbuskabel 4 Heizwasser Eintritt R cklauf G 1 Au engewinde G 1 Au engewinde 4 3 2 1 A B C D E F Schutzvermerk ISO 16016 beachten Dimens...

Страница 23: ...rderansicht B2 Ventilatormodul Seitenansicht von links A1 B1 B2 A2 Legende D819495 2a Alle Ma e in mm Technische nderungen vorbehalten 4 3 2 1 A B C D E F 4 3 2 1 Schutzvermerk ISO 16016 beachten Dime...

Страница 24: ...m glich keine wasserf hrenden Leitungen Gehwege ungeeignete Bepflanzungen FS Freiraum f r Servicezwecke LR Luftrichtung OKB Oberkante Boden FA Fertigau enfassade FA OKB OKB FA FA FA FA 4 3 2 1 A B C...

Страница 25: ...t R cklauf 3 Kondensatablaufrohr DN 40 8 Haube vertikales Anschlussset 9 Bodenteil Haube OKB Oberkante Boden E OKB OKB 4 3 2 1 A B C D E F 4 3 2 1 Zus Schutzvermerk ISO 16016 beachten Connection set I...

Страница 26: ...Fundament darf keinen K rperschallkontakt zum Geb ude haben OKF Oberkante Fundament GK Ger tekontur OKB Oberkante Boden 16 Leerrohr f r Bus Kabel 17 Leerrohr f r Elektrokabel 18 Heizwasser Vor und R c...

Страница 27: ...Fundament GK Ger tekontur OKB Oberkante Boden 16 Leerrohr f r Bus Kabel 17 Leerrohr f r Elektrokabel 18 Heizwasser Vor und R cklaufleitung Das Fundament darf keinen K rperschallkontakt zum Geb ude ha...

Страница 28: ...498 1 Technische nderungen vorbehalten Alle Ma e in mm B Seitenansicht von links OKFB FA 4 B LRO OKFB W 125 10 120 min 120 min 120 min 400 50 orizontales_Anschlussset_WDFAV SLDDRW 819498_Horizontales_...

Страница 29: ...nderungen vorbehalten Alle Ma e in mm B Seitenansicht von links C Draufsicht OKFB OKB 4 11 5 FA OKF 125 175 10 400 50 120 min 5 11 865 50 755 10 420 10 819498_Horizontales_Anschlussset_WDFAV SLDDRW 81...

Страница 30: ...che nderungen vorbehalten Alle Ma e in mm B Seitenansicht von links C Draufsicht OKFB 4 3 2 1 A B C D E F 4 3 2 1 Zust Schutzvermerk ISO 16016 beachten 819498_Horizontales_Anschlussset_WDFAV SLDDRW 81...

Страница 31: ...14 70 11 GK 60 14 70 11 GK 60 4 3 2 1 A B C D E F 4 3 2 1 Zust Schutzvermerk ISO 16016 beachten B C C OKB OKF 14 Kondensatablaufrohr DN100 bauseits 11 Fundament frostsicher C Draufsicht B Seitenansic...

Страница 32: ...b served facing away from the coast prevailing wind direction 9 in a sheltered area near a wall 9 not in open areas 9 not in sandy surroundings to avoid the influx of sand on the seaward side 9 in an...

Страница 33: ...abgeleitet ist auf eine Verlegung mit einem Gef lle zu achten In allen F llen Abbildung 1a und Abbildung 1b muss gew hrleistet sein dass das Kondenswasser frostfrei abgef hrt wird 1b 1a 1c 4 3 2 1 A B...

Страница 34: ...keine zus tzlichen Abflussleitungen angeschlossen werden In allen F llen Abbildung 2a muss gew hrleistet sein dass das Kondenswasser frostfrei abgef hrt wird 2a 4 3 2 1 A B C D E F 4 3 2 1 a Zu Schut...

Страница 35: ...without notice 83059600lUK ait deutschland GmbH LWAV with hydraulic station T 102 T 100 2 66 11 D 101 12 M 24 7 25 HUP 54 50 75 111 26 BUP A B 46 5 8 8 B TBW ZWE 46 5 46 62 12 1 104 3 3 31 31 A TA 83...

Страница 36: ...59600lUK ait deutschland GmbH 54 B TBW 111 8 8 B A 26 BUP 8 8 ZWE 6 M 24 7 5 8 46 71 38 62 23 ZUP T 102 T 100 2 66 11 D 101 H TRL 5 12 12 8 8 50 111 1 104 3 3 31 31 A TA 8371234 8371234 LWAV with buff...

Страница 37: ...schland GmbH LWAV with separation buffer tank 66 11 8 8 8 10 9 HUP D 101 T 102 T 100 2 66 11 8 8 8 10 21 FP1 C TB1 15 MK1 D 101 T 102 T 100 54 B TBW 111 8 8 8 8 B A 26 BUP 18 ZWE 61 G TRL 111 8 10 23...

Страница 38: ...mfort board Expansion board 29 Dirt trap 0 6 mm mesh 15 Mixer circuit three way mixer MK2 3 discharge r o t a l u g e r e c n e r e f f i d e r u t a r e p m e T 7 1 l a n o i t p o g n i l o o c r o...

Страница 39: ...BP1 F2 BP1 BP2 F1 BP2 BP Q10 R20 C1 X10 X100 1 N PE 230V 50Hz F6 X400 1 G1 X300 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 1 2 3 4 5 6 7 AIT 817450 Stromlaufplan ait deutschland GmbH PEP01...

Страница 40: ...X15 B11 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 2 2 3 4 5 6 7 AIT 817450 Stromlaufplan ait deutschland GmbH PEP011 2017 M 017 2018 19 07 2017 13 04 2018 AP AP z21 Mod A Ven 1 B8 Mod B V...

Страница 41: ...BP2 Q10 RF1 X10 X100 3 N PE 400V 50Hz F6 X400 1 G1 X300 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 1 2 3 4 5 6 7 AIT 817451 Stromlaufplan ait deutschland GmbH PEP011 2017 31 07 2017 AP U...

Страница 42: ...XE R6 R2 B10 X15 B11 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 2 2 3 4 5 6 7 AIT 817451 Stromlaufplan ait deutschland GmbH PEP011 2017 31 07 2017 AP Mod A Ven 1 B8 Mod B Ven 1 B8 Mod A 1...

Страница 43: ...79P41 15213141 15212501 EN 60335 2 40 2014 II A1 ait deutschland GmbH Industrie Str 3 93359 Kasendorf Germany Designation of the device s Number Heat Pump EC Declaration of Conformity 2014 35 EU 813 2...

Страница 44: ...ait deutschland GmbH Industriestra e 3 D 95359 Kasendorf E info alpha innotec de W www alpha innotec de alpha innotec an ait deutschland GmbH brand UK...

Отзывы: