___________________________________________________________________
Alpha ESS Co., Ltd.
Page 18 of 40
Your Smart Energy
Step 14:
Lock the cable box back cover, leave the power line and communica-
tion line hang on the outside. Follow the diagram, pass the BAT-communica-
tion cable through the battery communication baffle in Step 2 and connect an
RJ45 connector, see Figure 22.
Figure 23 Network Cable Type B
NOTE: The communication cable is in type B, see Figure 23. Leave the
power cables and communication cables hang on the outside. Leave the
device aside.
Figure 24 Inverter Installation on the Wall
Step 15
: Hang the inverter onto the mounting panels, adjust the entire system
and ensure that the battery and the inverter have been securely hung onto the
panels and brackets.
NOTE: Pay attention to the placing direction of the power and communication
cables.