___________________________________________________________________
Alpha ESS Co., Ltd.
Page 24 of 40
Your Smart Energy
NOTE: Meter 7, 8 connect the RJ45 3, 6, then RJ45 connect the cable box/super
cable box.
ADL-3000 three-phase connect (without CT, with meter plug), if applicable:
Figure 36 ADL-3000 three-phase Connect (without CT, with Meter plug)
ADL-3000 three-phase connect (with CT, without meter plug), if applicable:
Figure 37 ADL-3000 three-phase Connect (with CT, without Meter plug)
NOTE: Meter 7, 8 connect the RJ45 3, 6, then RJ45 connect the cable box/super
cable box.