___________________________________________________________________
Alpha ESS Co., Ltd.
Page 13 of 40
Your Smart Energy
Figure 13 Assemble Battery Mounting Panel
Step 5:
Assemble the battery mounting panel on the battery.
Figure 14 Battery Installation - Drill Holes
Step 6:
Keep the battery against the wall, drill holes on the wall with an impact
drill.
NOTE: please make sure a layer of protection must be placed over the
battery while drilling, it could be paper, wood board or packaging bubble,
as Figure 14 shows
)
.
The ground upon which the battery will be placed on must be less than 3
degree to the horizontal level.
M5*10 Screws
Debris Baffle