21 / 55
Where more than 4 batteries are installed, some batteries shall be installed beside,
distance between two rows batteries shall be not less than 100 mm
SMILE-T10 shall be mounted with the highest point no greater than 2.2 m above the
floor or platform.
2.2
Installation
Figure 13 Unpacking the Battery
Step 1:
Take the battery out of the packaging box.
Note: the packaging box must be placed in accordance with the marking
direction, the upward carton, the other direction of the unpacking is wrong.
Figure 14 Removing Front Panel
Step 2:
Pull the buckle from the bottom right in the middle and pull the top two
guide rods to remove the front panel.