![Alpha ESS ES-Alpha-Smile 5-10KWH-v2 Скачать руководство пользователя страница 83](http://html.mh-extra.com/html/alpha-ess/es-alpha-smile-5-10kwh-v2/es-alpha-smile-5-10kwh-v2_installation-operation-and-maintenance-manual_2905569083.webp)
COMMISSIONING
81
9.3.2.3
Check the UPS State
Please connect an essential electrical appliance to the socket of backup load. Or
switch on an essential electrical appliance already connected on the backup load
port of the inverter.
Switch on the AC breaker on the backup port of the energy storage inverter.
Switch off the external AC breaker between the grid and the energy storage
inverter.
The inverter will enter the UPS mode at once.
If the electrical appliance on backup side can work normally, it means that the
wiring of the backup has been connected correctly.
Содержание ES-Alpha-Smile 5-10KWH-v2
Страница 1: ...V01 INSTALLATION OPERATION MAINTENANCE MANUAL OF SMILE5 ENERGY STORAGE SYSTEM ESS ...
Страница 2: ......
Страница 68: ...Installer Account Register and Install New System 66 7 1 3 Overview of Functions for Installer Account ...
Страница 111: ...Appendix 1 System Overview 109 13 Appendix 1 System Overview ...
Страница 113: ...Appendix 2 Regional Application Standard 111 ...