COMMISSIONING
76
9.3.1.1
Basic Parameters Settings
DC Mode
Three mode options:
DC
/AC/Hybrid
Storage PV capacity: PV capacity on the energy storage inverter side
You can set the allowable feed-in ratio from 0%-100%.
Note:
When the safety standard is set as AS4777.2 (Australia and New Zealand),
the secondary sub-options can be selected according to the region or local
grid company.
On the grid side, if only a CT is installed, please select CT for grid side.
If the grid meter is installed, please select Meter for grid side. If this meter is
a CT meter and the CT ratio is not 1, please select CT below and input the
Meter CT Ratio. If this meter is not a CT meter or the CT ratio is 1, please
Click “Submit” when the
settings are complete.
Storage PV Capacity
5 kW
DC
Содержание ES-Alpha-Smile 5-10KWH-v2
Страница 1: ...V01 INSTALLATION OPERATION MAINTENANCE MANUAL OF SMILE5 ENERGY STORAGE SYSTEM ESS ...
Страница 2: ......
Страница 68: ...Installer Account Register and Install New System 66 7 1 3 Overview of Functions for Installer Account ...
Страница 111: ...Appendix 1 System Overview 109 13 Appendix 1 System Overview ...
Страница 113: ...Appendix 2 Regional Application Standard 111 ...