
Step 5
Locate a 45° corner posts and orient it so the tapered side of the clip points down. Position the clips on the posts above the clips of the adjacent
wall section. Push the post into the wall section and firmly slide down, tapping into place with a rubber mallet. Verify that each of the 3 clips have
nested snugly into each other. Repeat this process for the other side.
Step 6
Remove the transport strip at the base of the door frame. With the rubber gasket facing outward, align the clips of the door frame to the clips of
the adjacent 45° posts and firmly slide the door frame down, tapping each side into place with a rubber mallet. Verify that all clips have nested
snugly into each other. At the top, middle, and base of the door frame, pre-drill 6 holes (3 on each side) and secure the door frame to the corner
posts using 5x70mm screws.
Step 7
Locate the 6 bench supports. Use the 5x70mm screws to secure the 30” supports so that the top of the support measures 14.5” from the floor.
Repeat for the opposite side. Next, secure the 22” supports so the top of the support measures 31 5/8” from the floor. Repeat for the opposite
side. Finally, secure the 10” vertical bench-cover mounting slat perpendicular to the upper slat, being sure the center of the mounting slat sits at
the edge of the 22” support. Repeat for the opposite side.
Image 8
Image 9
Image 10
Image 16
Image 17
SUTTON SAUNA INSTALLATION MANUAL
page 3
Image 11
Image 12 Image 13
Image 14 Image 15
31 5/8”
14 1/2”