128
TRACK REPLACEMENT PROCEDURE
WARNING: It is forbidden to open the reduction
gear unit for any operation other than routine
maintenance. The manufacturer declines all
liability for operations that are not part of routine
maintenance and that have caused damage to
persons or things.
Contact a specific assistance centre if
necessary.
.
Track replacement:
The tracks must be replaced when the tread
has worn down to 10 mm or even sooner if cuts
are noted. Proceed as described below:
1) Do not raise the machine too far from the
ground (30-40 cm are sufficient). Use the
stabilizers if the machine is equipped
with them, or use a jack as indicated in
section 3.1.
WARNING: Make sure that the machine
is in a stable position.
2) Thoroughly clean the undercarriage.
3) Remove the side clamp from the
longitudinal frame member (Figure 10).
Some models are not equipped with this
component (Figure 11).
Содержание BiBi 850 HE
Страница 6: ...5 Chapter 1 General information...
Страница 10: ...9 1 6 Performances H I A B L F E C G...
Страница 19: ...18 Chapter 2 Safety information...
Страница 24: ...23...
Страница 25: ...24 2 3 2 Warning command danger identification and instruction signs...
Страница 40: ...39 Chapter 3 Machine Description...
Страница 41: ...40 3 1 Structure of the machine 2 4 5 6 7 9 10 11 13 14 19 27 28 15 18...
Страница 42: ...41 View from A 20 22 21 23 24...
Страница 43: ...42 12 8 25 16...
Страница 44: ...43 17 2 26...
Страница 45: ...44 3...
Страница 56: ...55...
Страница 59: ...58 Chapter 4 Instructions for use...
Страница 68: ...67...
Страница 69: ...68 For more information refer to Engine Use maintenance manual...
Страница 71: ...70...
Страница 72: ...71 For more information refer to Engine Use maintenance manual...
Страница 91: ...90 Chapter 5 Emergency procedures...
Страница 94: ...93 Chapter 6 Maintenance...
Страница 105: ...104 Electrical panel casing Battery 1...
Страница 116: ...115...
Страница 117: ...116...
Страница 118: ...117...
Страница 119: ...118...
Страница 120: ...119...
Страница 123: ...122...
Страница 124: ...123...
Страница 125: ...124...
Страница 133: ...132...
Страница 136: ...135 HATZ ENGINE...
Страница 137: ...136...
Страница 138: ...137...
Страница 139: ...138 Chapter 7 Demolition...
Страница 141: ...140 APPENDICES...
Страница 142: ...141 Appendix 1 Declaration of conformity...
Страница 144: ...143 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Страница 157: ...156 Appendix 4 Hydraulic diagram Appendix 5 Circuit diagram...