110
B) ANTI-CRUSHING
This test is performed by lowering the platform from a >2 m floor height and by checking the following
conditions:
•
that descent stops automatically at a preset point
•
between the outer ends of the scissor here there is a space > 50 mm (check with a measuring
tape)
•
A buzzer warns when this operation is in progress.
•
A wait time of approximately 3 seconds has been included
to allow the operator to check
for the absence of bystanders in the danger zone if the “platform descent” button remains
depressed once the anti-crushing position has been reached. The aforementioned audible
warning devices and indicator lights continue to operate during this period of time.
If the operation described in the previous step results as indicated, it means that the security of the
inclinometer is working correctly.
> 50 mm
Содержание BiBi 850 HE
Страница 6: ...5 Chapter 1 General information...
Страница 10: ...9 1 6 Performances H I A B L F E C G...
Страница 19: ...18 Chapter 2 Safety information...
Страница 24: ...23...
Страница 25: ...24 2 3 2 Warning command danger identification and instruction signs...
Страница 40: ...39 Chapter 3 Machine Description...
Страница 41: ...40 3 1 Structure of the machine 2 4 5 6 7 9 10 11 13 14 19 27 28 15 18...
Страница 42: ...41 View from A 20 22 21 23 24...
Страница 43: ...42 12 8 25 16...
Страница 44: ...43 17 2 26...
Страница 45: ...44 3...
Страница 56: ...55...
Страница 59: ...58 Chapter 4 Instructions for use...
Страница 68: ...67...
Страница 69: ...68 For more information refer to Engine Use maintenance manual...
Страница 71: ...70...
Страница 72: ...71 For more information refer to Engine Use maintenance manual...
Страница 91: ...90 Chapter 5 Emergency procedures...
Страница 94: ...93 Chapter 6 Maintenance...
Страница 105: ...104 Electrical panel casing Battery 1...
Страница 116: ...115...
Страница 117: ...116...
Страница 118: ...117...
Страница 119: ...118...
Страница 120: ...119...
Страница 123: ...122...
Страница 124: ...123...
Страница 125: ...124...
Страница 133: ...132...
Страница 136: ...135 HATZ ENGINE...
Страница 137: ...136...
Страница 138: ...137...
Страница 139: ...138 Chapter 7 Demolition...
Страница 141: ...140 APPENDICES...
Страница 142: ...141 Appendix 1 Declaration of conformity...
Страница 144: ...143 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Страница 157: ...156 Appendix 4 Hydraulic diagram Appendix 5 Circuit diagram...