Chapter 5: Verifying the Switch
72
Note
The illustration shows a North American power cord. Your power
cord may be different.
5. Wait two minutes for the switch to initialize the management software.
6. To verify hardware operations, begin with “Starting a Local
Management Session” on page 73. Otherwise, go to Chapter 6,
“Cabling the Networking Ports” on page 77.
Содержание x330-10GTX
Страница 1: ...613 002996 Rev A x330 10GTX Gigabit Layer 3 Ethernet Switch Installation Guide...
Страница 6: ...6...
Страница 10: ...Figures 10...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 36: ...Chapter 1 Overview 36...
Страница 48: ...Chapter 2 Beginning the Installation 48...
Страница 82: ...Chapter 6 Cabling the Networking Ports 82 Figure 46 Connecting a Fiber Optic Cable to an SFP or SFP Transceiver...
Страница 88: ...Chapter 7 Troubleshooting 88...
Страница 98: ...Appendix A Technical Specifications 98...