9
Figure 1: Front Panel............................................................................................................................................................19
Figure 2: Top Panel ..............................................................................................................................................................20
Figure 3: Bottom Panel.........................................................................................................................................................21
Figure 4: DIN Rail .................................................................................................................................................................29
Figure 5: Vertical Installation ................................................................................................................................................44
Figure 6: Unsupported DIN Rail Installations........................................................................................................................44
Figure 7: Unsupported Table, Desk, or Shelf Installation .....................................................................................................45
Figure 8: Minimum Spacing Requirements...........................................................................................................................45
Figure 9: Wrapping Wire Strands .........................................................................................................................................47
Figure 10: Verifying Wire Installation ....................................................................................................................................47
Figure 11: Installing the Power Supply on a DIN Rail...........................................................................................................48
Figure 12: Installing the Ground Wire ...................................................................................................................................51
Figure 13: Installing the AC Power Wires .............................................................................................................................53
Figure 14: Installing DC Output Power Wires .......................................................................................................................56
Figure 15: Wiring the RC Connector.....................................................................................................................................57
Figure 16: Wiring the DC_OK Connector .............................................................................................................................58
Figure 17: Operating Graph - Operating Properties and Ambient Temperature...................................................................70
Figure 18: IE048-480 Power Supply Dimensions .................................................................................................................71
Figures
Содержание IE048-480
Страница 1: ...613 002833 Rev A IE048 480 Industrial AC DC Power Supply Installation Guide...
Страница 6: ...6 I PDF Allied Telesis alliedtelesis com library...
Страница 8: ...Contents 8...
Страница 10: ...Figures 10...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 21: ...IE048 480 Power Supply Installation Guide 21 Figure 3 Bottom Panel AC Input Connectors Ground Connector...
Страница 42: ...Chapter 2 Beginning the Installation 42...
Страница 51: ...IE048 480 Power Supply Installation Guide 51 Figure 12 Installing the Ground Wire...
Страница 53: ...IE048 480 Power Supply Installation Guide 53 Figure 13 Installing the AC Power Wires...
Страница 60: ...Chapter 3 Installing the Power Supply 60...
Страница 72: ...Appendix A Technical Specifications 72...