IE048-480 Power Supply Installation Guide
59
Verifying the Power Supply
To verify the power supply and powered devices, perform the following
procedure:
1. If the power supply is powered off, turn on the AC circuit breaker.
2. Inspect the ALARM and DC_OK LEDs on the front panel. The ALARM
LED should be off and the DC_OK should be solid green.
3. Wait for the powered devices to power on and initialize their
management software.
4. Examine their LEDs to verify that they are operating normally. Refer to
the devices’ installation guides for LED descriptions.
5. For Power over Ethernet (PoE) switches, start management sessions
and display their power budgets for powered devices. For example, the
SHOW POWER-INLINE command displays the power budgets on
IE200, IE300, and IE340 series Ethernet switches from Allied Telesis.
Refer to their installation or management software user guides for
instructions.
Содержание IE048-480
Страница 1: ...613 002833 Rev A IE048 480 Industrial AC DC Power Supply Installation Guide...
Страница 6: ...6 I PDF Allied Telesis alliedtelesis com library...
Страница 8: ...Contents 8...
Страница 10: ...Figures 10...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 21: ...IE048 480 Power Supply Installation Guide 21 Figure 3 Bottom Panel AC Input Connectors Ground Connector...
Страница 42: ...Chapter 2 Beginning the Installation 42...
Страница 51: ...IE048 480 Power Supply Installation Guide 51 Figure 12 Installing the Ground Wire...
Страница 53: ...IE048 480 Power Supply Installation Guide 53 Figure 13 Installing the AC Power Wires...
Страница 60: ...Chapter 3 Installing the Power Supply 60...
Страница 72: ...Appendix A Technical Specifications 72...