x310 Series Installation Guide for Stand-alone Switches
97
Monitoring the Initialization Processes
It takes about one and a half minutes for the switch to initialize its
management software programs and features, and load the default
configuration. You may monitor the progress of the initialization process by
watching the switch ID LED. It displays the number “8” for the first minute
and afterwards the number “1.”
You may also monitor the bootup sequence by connecting a terminal or
computer that has a terminal emulator program to the Console port on the
master switch. The messages are given in Figure 49 here to Figure 51 on
page 99. The messages may differ slightly depending on whether your
switch is a PoE or non-PoE model.
After the switch has initialized its management software, go to
“Configuring the Switch for Stand-alone Operations” on page 100.
Figure 49. Switch Initialization Messages
Bootloader 3.0.2 loaded
Press <Ctrl+B> for the Boot Menu
Reading filesystem...
Loading flash:x310-1706_x950-latest.rel...
Verifying release... OK
Booting...
Starting base/first...
[
OK
]
Mounting virtual filesystems... [
OK
]
______________
____
/\ \
/ /______\
/
\ \_
__/ /| ______ |
/
\ |
|
/
| ______ |
/
\ \
/ /
\ ____ /
/______/\____\ \/ /____________/
Allied Telesis Inc.
AlliedWare Plus (TM) v0.0.0
Current release filename: x310-1706_x950-latest.rel
Original release filename: x310-1706_x950-20140206-1.rel
Built: Thu Feb 6 01:14:24 NZdT 2014
hwclock:settimeofday: Invalid argument
Содержание AT-x310-26FP
Страница 10: ...Tables 10 ...
Страница 14: ...Preface 14 ...
Страница 46: ...Chapter 1 Overview 46 ...
Страница 56: ...Chapter 2 Beginning the Installation 56 ...
Страница 92: ...Chapter 5 Cabling the Networking Ports 92 ...
Страница 106: ...Chapter 6 Powering On the Switch 106 ...
Страница 116: ...Appendix A Technical Specifications 116 ...