AT-x230-10GT, AT-x230-10GP, AT-x230-18GT, AT-x230-18GP, AT-x230-28GT and AT-x230-28GP Switch Installation Guide
51
Unpacking the switch: AT-x230-10GP
To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipped package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the shipped package includes the following items:
1 Power cable hook
AT-x230-10GP
x230-1
0GP
CO
NS
OL
E
RS-
232
SD
FA
ULT
PO
WER
SD
100
0 LIN
K
AC
T
10/1
00 L
INK
AC
T
PD
ON
PD
ER
R
MAX
CUR
RENT
SFP
9
10
2
4
6
8
1
3
5
7
MA
C A
dd
ress
La
bel
1 Power cable (1.8m)
1 Console cable (2m)
Содержание AT-x230-10GP
Страница 10: ...viii...
Страница 14: ...4...
Страница 92: ...Chapter 2 Installation 82...
Страница 102: ...Appendix A Technical specifications 92...