AT-x230-10GT, AT-x230-10GP, AT-x230-18GT, AT-x230-18GP, AT-x230-28GT and AT-x230-28GP Switch Installation Guide
73
3. Plug the other end of the power cord into a wall outlet.
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.
E3
Pluggable Equipment:
The socket outlet shall be installed near the
equipment and shall be easily accessible.
E5
4. Verify that the POWER LED is green. If the LED is OFF, see Chapter
3, “Troubleshooting” on page 83.
The switch is now powered on and ready for network operations.
The switches are shipped with the management software pre-installed.
The software provides a command line interface and a GUI (Graphical
User Interface) for in-band, over-the-network management.
For information about how to manage the switch, refer to the product
documentation on the product series web page, at
www.alliedtelesis.com/products/switches/x230-series
. The product
documentation includes:
this Installation Guide,
a detailed Command Reference, and
Feature Overview and Configuration Guides for each supported
feature.
Содержание AT-x230-10GP
Страница 10: ...viii...
Страница 14: ...4...
Страница 92: ...Chapter 2 Installation 82...
Страница 102: ...Appendix A Technical specifications 92...