Chapter 3: Preparing the Switches of the Stack
66
The master switch then configures the devices with the commands in the
active configuration file in its file system. If this is the first time the stack is
booted up, you will see the messages in Figure 29.
Figure 29. Console Messages at the Completion of the Discovery Process
At this point, the stack is operational and ready to forward network traffic
on the ports. To log in and manage the stack, press Return to display the
login prompt.
An alternative method for monitoring the initialization process is by
observing the Stack MSTR LED on the front panel of the master switch.
The LED becomes steady green when the stack is ready for network
operations. (Do not confuse the Stack MSTR LED with the Status
MASTER LED. The latter is used with enhanced stacking, a feature not
supported on a stack.)
Go to the next procedure, “Verifying the Installation” on page 67.
Configuring the Stack............................. done!
Reinitializing Software Modules .................. done!
Configuration file "stack.cfg" not found!
Loading default configuration ........ done!
Содержание AT-9424Ts AC
Страница 8: ...Table of Contents 8...
Страница 16: ...Preface 16...
Страница 36: ...Chapter 1 Overview 36...
Страница 82: ...Chapter 4 Cabling the Network Ports 82...
Страница 100: ...Appendix A Technical Specifications 100...