51
Chapter 3
Preparing the Switches of the Stack
The chapter contains the following procedures:
“Verifying the AT-S63 Version Number” on page 52
“Choosing Static or Dynamic Module ID Numbers” on page 55
“Labelling the Switches” on page 56
“Assigning the Static Module ID Number 1 to the Master Switch” on
page 58
“Assigning a Static Module ID Number to the Member Switches” on
page 61
“Cabling the AT-StackXG Stacking Modules” on page 62
“Powering On the Switches of the Stack” on page 65
“Verifying the Installation” on page 67
“Troubleshooting the Discovery Process” on page 71
Содержание AT-9424Ts AC
Страница 8: ...Table of Contents 8...
Страница 16: ...Preface 16...
Страница 36: ...Chapter 1 Overview 36...
Страница 82: ...Chapter 4 Cabling the Network Ports 82...
Страница 100: ...Appendix A Technical Specifications 100...