37
Chapter 2
Installing the Hardware
This chapter contains an overview of the installation procedures of a stack
and the procedures for the first phase, installing the hardware. The chapter
contains the following sections:
“Installation Overview” on page 38
“Reviewing Safety Precautions” on page 40
“Planning the Installation of a Stack” on page 42
“Maximum Number of Switches in a Stack” on page 43
“Unpacking a Switch” on page 44
“Installing the AT-StackXG Stacking Module” on page 45
“Installing the Power Cord Retaining Clip (AC Switches Only)” on
page 48
“Installing the Switches in an Equipment Rack” on page 49
Note
Allied Telesis recommends reading Chapter 1, “Overview,” in the
AT-S63 Stack Command Line Interface User’s Guide
before you
begin the installation. It will be easier for you to install and configure
the stack if you have an understanding of the information in that
chapter.
Содержание AT-9424Ts AC
Страница 8: ...Table of Contents 8...
Страница 16: ...Preface 16...
Страница 36: ...Chapter 1 Overview 36...
Страница 82: ...Chapter 4 Cabling the Network Ports 82...
Страница 100: ...Appendix A Technical Specifications 100...