64
512176
Section 5 Service Procedures
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
k. Remove two screws holding motor mounting
bracket to dryer base. Then pull complete
assembly forward to disengage middle exhaust
duct.
l. Rotate the assembly
counterclockwise
90° and
slide out front of machine.
m. Disconnect wires from motor switch and
remove harness clip from motor bracket. Refer
to
. Then, set motor and blower
assembly off to the side.
n. Remove screw holding bracket on exhaust duct
to rear of cabinet and pull duct out of cabinet.
Refer to
.
IMPORTANT: When reinstalling motor and blower
assembly, be sure wire harness on right side is
clipped to motor mounting bracket and is routed
along dryer base (between motor mounting bracket
and right side of cabinet). Refer to
. Tab on
rear of motor mounting bracket must be slid into
slot in dryer base. Be sure the belt has been installed
on the correct side of the idler lever. Refer to
o. Remove cabinet per
.
p. Remove leveling legs from base and reinstall
on new base. Refer to
.