SECTION 1
SAFETY
064633
Page 26
A strap or chain can be attached to these hooks, allowing a forklift or crane to lift the screed up onto and off of a slab of
concrete. The strap or chain should have a minimum of 2,000 pounds (1,000 kg) lifting capacity and the lifting device must
be capable of lifting at least this amount.
ALWAYS
make sure crane or lifting device has been properly secured to the lifting hooks on the equipment.
ALWAYS
shutdown engine before transporting.
NEVER
lift the equipment while the engine is running.
Tighten fuel tank cap securely and close fuel cock to prevent fuel from spilling.
Use adequate lifting cable (wire or rope) of sufficient strength.
DO NOT
lift machine to unnecessary heights.
ALWAYS
tie down equipment during transport by securing the equipment with rope.
TOWING SAFETY
Check with your local county or state safety towing regulations, in addition to meeting Department of
Transportation (DOT) Safety Towing Regulations, before towing your screed.
In order to reduce the possibility of an accident while transporting the screed on public roads, ALWAYS
make sure the trailer that supports the screed and the towing vehicle are mechanically sound and in good operating con-
dition.
ALWAYS
shutdown engine before transporting
Make sure the hitch and coupling of the towing vehicle are rated equal to, or greater than the trailer “gross vehicle weight
rating.”
ALWAYS
inspect the hitch and coupling for wear.
NEVER
tow a trailer with defective hitches, couplings, chains, etc.
Check the tire air pressure on both towing vehicle and trailer. Trailer tires should be inflated to 50 psi cold. Also check the
tire tread wear on both vehicles.
General Safety, continued
Содержание SE12
Страница 17: ...SECTION 1 SAFETY 064633 Page 17 SECTION 1 SAFETY ...
Страница 18: ...SECTION 1 SAFETY 064633 Page 18 State Regulations Proposition 65 Warning ...
Страница 19: ...SECTION 1 SAFETY 064633 Page 19 Federal Regulation Respiratory Hazard ...
Страница 30: ...SECTION 1 SAFETY 064633 Page 30 Notes ...
Страница 31: ...SECTION 2 OPERATIONS 064633 Page 31 SECTION 2 OPERATIONS ...
Страница 41: ...SECTION 3 SERVICE 064633 Page 41 SECTION 3 SERVICE ...
Страница 45: ...SECTION 4 PARTS 064633 Page 45 SECTION 4 Parts ...
Страница 72: ...SECTION 4 PARTS 064633 Page 72 4 13 End Mount Engine Assembly Illustration ...